NO. 2 GAS safety activity
MSHA violations, accident reports and inspections.
Safety activity
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $818.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $245.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(b) · $245.00 proposed penalty
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2) · $245.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(e) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $245.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $504.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $398.00 proposed penalty
Self-rescue devices; use and location requirements.
30 CFR 75.1714-2(g)(2) · $818.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $398.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $245.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $245.00 proposed penalty
Multi-gas detectors.
30 CFR 75.1714-7(a) · $267.00 proposed penalty
Temporary notations, revisions, and supplements.
30 CFR 75.1202 · $151.00 proposed penalty
Regular Safety and Health Inspection
193.5 on-site hours reported
Electrical Technical Investigation
12.0 on-site hours reported
Low- and medium-voltage circuits serving three-phase alternating current equipment; circuit breakers.
30 CFR 75.900 · Significant and substantial (S&S) · $4,047.00 proposed penalty
Tests of fire hydrants and fire hose; record of tests.
30 CFR 75.1103-11 · $151.00 proposed penalty
Violation — cited standard not reported
$4,871.00 proposed penalty
Violation — cited standard not reported
$17,521.00 proposed penalty
Verbal Hazard Complaint Inspections
10.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.