← Muddy Bridge

Muddy Bridge safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 9837781

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  2. Drill dust control at underground areas of underground mines.

    violationRecord 9837780

    30 CFR 72.630(b) · $193.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9837779

    30 CFR 75.400 · $226.00 proposed penalty

  4. Quarterly sampling; mechanized mining units.

    violationRecord 9837778

    30 CFR 70.208(b)(3) · $177.00 proposed penalty

  5. Verbal Hazard Complaint Inspections

    inspectionRecord 7047769

    7.5 on-site hours reported

  6. Rock dusting.

    violationRecord 9837136

    30 CFR 75.402 · $697.00 proposed penalty

  7. Violation — cited standard not reported

    violationRecord 9837775

    $297.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9837774

    30 CFR 75.1731(a) · $398.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 9837773

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 9837772

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  11. Methane monitors.

    violationRecord 9837771

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  12. Temporary notations, revisions, and supplements.

    violationRecord 9837770

    30 CFR 75.1202-1(b)(3) · $151.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 9591672

    30 CFR 75.202(a) · Significant and substantial (S&S) · $818.00 proposed penalty

  14. Ventilation controls.

    violationRecord 9591671

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  15. Rock dusting.

    violationRecord 9837769

    30 CFR 75.402 · $267.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9837768

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 9837767

    30 CFR 75.604(b) · $642.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 9837766

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  19. Ventilation controls.

    violationRecord 9591670

    30 CFR 75.333(h) · $177.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 9837762

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  21. Cable fittings; suitability.

    violationRecord 9837761

    30 CFR 75.515 · $398.00 proposed penalty

  22. Escapeway maps.

    violationRecord 9837760

    30 CFR 75.1505(b) · $267.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 9837759

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  24. Other safeguards.

    violationRecord 9591669

    30 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 9591668

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.