  1. Short circuit protection of trailing cables.

    violationRecord 5091275

    30 CFR 75.601 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  2. Power wires and cables; insulation and protection.

    violationRecord 5091259

    30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5091258

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  4. Drill dust control at underground areas of underground mines.

    violationRecord 5091257

    30 CFR 72.630(b) · $366.00 proposed penalty

  5. Machinery and equipment; operation and maintenance.

    violationRecord 5091256

    30 CFR 75.1725(a) · $151.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5091255

    30 CFR 75.202(a) · $151.00 proposed penalty

  7. Automatic fire sensors.

    violationRecord 5091254

    30 CFR 75.1103-1(b) · $151.00 proposed penalty

  8. Automatic fire sensors.

    violationRecord 5091253

    30 CFR 75.1103-1(b) · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5091252

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  10. Roof control plan.

    violationRecord 5091251

    30 CFR 75.220(a)(1) · $1,818.00 proposed penalty

  11. Inspection of fire suppression devices.

    violationRecord 5091250

    30 CFR 75.1107-16(b) · $288.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 5091249

    30 CFR 75.517 · $2,712.00 proposed penalty

  13. Escapeway maps.

    violationRecord 5098223

    30 CFR 75.1505(b) · $226.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5096864

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5092035

    30 CFR 75.400 · $336.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5091248

    30 CFR 75.202(a) · $151.00 proposed penalty

  17. Preshift examination at fixed intervals.

    violationRecord 5091247

    30 CFR 75.360(b)(11)(iii) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  18. Roof control plan.

    violationRecord 5091246

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5091245

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5091244

    30 CFR 75.202(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5091243

    30 CFR 75.517 · Significant and substantial (S&S) · $6,037.00 proposed penalty

  22. Roof control plan.

    violationRecord 5091242

    30 CFR 75.220(a)(1) · $2,936.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5091241

    30 CFR 75.400 · $336.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 5091240

    30 CFR 75.1722(a) · $1,679.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5091239

    30 CFR 75.202(a) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.