Muddy Bridge safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Methane monitors.

    violationRecord 5091299

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5091298

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5091297

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5091296

    30 CFR 75.400 · $165.00 proposed penalty

  5. Escapeways; bituminous and lignite mines.

    violationRecord 5091295

    30 CFR 75.380(f)(3)(iii) · $755.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 5091294

    30 CFR 75.517 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  7. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5091292

    30 CFR 75.363(a) · Significant and substantial (S&S) · $6,194.00 proposed penalty

  8. Roof control plan.

    violationRecord 5091291

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5091290

    30 CFR 75.512 · $465.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5091289

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $697.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5091288

    30 CFR 75.400 · $151.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5091287

    30 CFR 75.202(a) · Significant and substantial (S&S) · $642.00 proposed penalty

  13. Escapeways; bituminous and lignite mines.

    violationRecord 5098239

    30 CFR 75.380(d)(1) · $226.00 proposed penalty

  14. Escapeways; bituminous and lignite mines.

    violationRecord 5092059

    30 CFR 75.380(f)(5)(ii) · $151.00 proposed penalty

  15. Power wires and cables; insulation and protection.

    violationRecord 5092058

    30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  16. Permissible electric face equipment; maintenance.

    violationRecord 5092057

    30 CFR 75.503 · $151.00 proposed penalty

  17. Short circuit protection of trailing cables.

    violationRecord 5091284

    30 CFR 75.601 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5091283

    30 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5091282

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  20. Mechanical equipment guards.

    violationRecord 5091281

    30 CFR 75.1722(b) · $151.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5091280

    30 CFR 75.400 · $151.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5091279

    30 CFR 75.400 · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5091278

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5091277

    30 CFR 75.1731(a) · $151.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5091276

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.