← Muddy Bridge

Muddy Bridge safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5099258

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  2. Other safeguards.

    violationRecord 5099257

    30 CFR 75.1403 · $193.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5099256

    30 CFR 75.517 · $209.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5099255

    30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  5. Smoking; prohibition.

    violationRecord 5099254

    30 CFR 75.1702 · $151.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5096958

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5096957

    30 CFR 75.333(e)(1)(ii) · $267.00 proposed penalty

  8. Automatic fire sensors; approved components; installation requirements.

    violationRecord 9837186

    30 CFR 75.1103-2(b) · $151.00 proposed penalty

  9. Roof control plan.

    violationRecord 5096956

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5096955

    30 CFR 75.400 · $1,679.00 proposed penalty

  11. Belt air course ventilation.

    violationRecord 5096954

    30 CFR 75.350(a)(2) · $267.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5096953

    30 CFR 75.400 · $432.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5096952

    30 CFR 75.1731(a) · $398.00 proposed penalty

  14. Condition and examination of firefighting equipment.

    violationRecord 5096951

    30 CFR 75.1100-3 · $151.00 proposed penalty

  15. Fall of roof or back

    accidentRecord 220253170367

    Accident only

    Accident narrative

    A non-injury roof fall occurred on 10/15/2025 at 11:54 am. The fall occurred in the #9 entry at the cc17 intersection in-by Spad No. 2321 on the 1E mains (5 belt) panel in the primary escapeway air course.

  16. Non-Injury Accident Investigation

    inspectionRecord F00CDC5

    16.5 on-site hours reported

  17. Protection from falls of roof, face and ribs.

    violationRecord 9838395

    30 CFR 75.202(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  18. Violation — cited standard not reported

    violationRecord 9838394
  19. Power wires and cables; insulation and protection.

    violationRecord 5091162

    30 CFR 75.517 · $209.00 proposed penalty

  20. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5091161

    30 CFR 75.1731(a) · $177.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5091160

    30 CFR 75.400 · $432.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 5096935

    30 CFR 75.604(b) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5096934

    30 CFR 75.400 · $193.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5096933

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  25. Methane monitors.

    violationRecord 5096932

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.