← Muddy Bridge

Muddy Bridge safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5098858

    30 CFR 75.512 · $165.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5098857

    30 CFR 75.400 · $432.00 proposed penalty

  3. Installation of high-voltage transmission cables.

    violationRecord 5098856

    30 CFR 75.807 · $267.00 proposed penalty

  4. Other safeguards.

    violationRecord 5096558

    30 CFR 75.1403

  5. Inspection of fire suppression devices.

    violationRecord 5096557

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  6. Roof bolting.

    violationRecord 5096556

    30 CFR 75.204(c)(1) · $267.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 5096555

    30 CFR 75.503 · $366.00 proposed penalty

  8. Changes in electric system map; recording.

    violationRecord 5098848

    30 CFR 75.508-2 · $151.00 proposed penalty

  9. Preshift examination at fixed intervals.

    violationRecord 5098846

    30 CFR 75.360(f) · $267.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5098845

    30 CFR 75.503 · $366.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F00EAF4

    191.0 on-site hours reported

  12. Permanent splicing of trailing cables.

    violationRecord 5098840

    30 CFR 75.604(b) · Significant and substantial (S&S) · $7,676.00 proposed penalty

  13. Roof control plan.

    violationRecord 5098839

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 5098838

    30 CFR 75.512 · $366.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5098837

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5098836

    30 CFR 75.400 · $465.00 proposed penalty

  17. Spot Inspection

    inspectionRecord F00856D

    8.8 on-site hours reported

  18. Spot Inspection

    inspectionRecord F026036

    1.8 on-site hours reported

  19. Violation — cited standard not reported

    violationRecord 9837199

    $184.00 proposed penalty

  20. Electrical Technical Investigation

    inspectionRecord F00A103

    15.5 on-site hours reported

  21. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5096973

    30 CFR 77.1606(c) · $1,818.00 proposed penalty

  22. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5096972

    30 CFR 77.1606(c) · $818.00 proposed penalty

  23. Identification of circuit breakers.

    violationRecord 5098478

    30 CFR 75.904 · $465.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5098477

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5131556

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.