Muddy Bridge safety activity
MSHA violations, accident reports and inspections.
Safety activity
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $642.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $177.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $592.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(j)
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $398.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $151.00 proposed penalty
Regular Safety and Health Inspection
234.3 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $267.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $1,320.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.