Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $336.00 proposed penalty
Regular Safety and Health Inspection
174.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $883.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Escapeway maps.
30 CFR 75.1505(b) · $267.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(c) · $151.00 proposed penalty
Construction and repair of seals.
30 CFR 75.337(h) · $755.00 proposed penalty
Roof testing and scaling.
30 CFR 75.211(d) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(a) · $177.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $267.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(f) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Automatic fire sensor and warning device systems; installation; minimum requirements.
30 CFR 75.1103-4(a) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $465.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $177.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $883.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $398.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.