Muddy Bridge safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
0.0 on-site hours reported
Spot Inspection
2.5 on-site hours reported
Weekly examination.
30 CFR 75.364(a)(1)
Verbal Hazard Complaint Inspections
1.0 on-site hours reported
Fall of roof or back
Accident only
Accident narrative
A unplanned roof fall occurred in the Washington 5 Panel , Crosscut number 14 ,100 feet Inby survey station 4701, Fall Measures 20' Wide x 5-6' high. This fall affects EP 20 A and EP 20 B
Non-Injury Accident Investigation
8.0 on-site hours reported
Violation — cited standard not reported
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(e) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Regular Safety and Health Inspection
54.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $366.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Regular Safety and Health Inspection
70.8 on-site hours reported
Spot Inspection
6.0 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $165.00 proposed penalty
Automatic fire sensors.
30 CFR 75.1103-1(b) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $642.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $151.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
30 CFR 75.1107-7(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.