← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5133476

    30 CFR 75.1731(b) · $226.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5133475

    30 CFR 75.400 · $432.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5132856

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5132855

    30 CFR 75.400 · $432.00 proposed penalty

  5. Inspection of fire suppression devices.

    violationRecord 5132854

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  6. Escapeways; bituminous and lignite mines.

    violationRecord 5132853

    30 CFR 75.380(d)(1) · $226.00 proposed penalty

  7. Cable fittings; suitability.

    violationRecord 5096341

    30 CFR 75.515 · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F005E8E

    103(i) · 7.0 on-site hours reported

  9. Machinery and equipment; operation and maintenance.

    violationRecord 5133474

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5133473

    30 CFR 75.400 · $432.00 proposed penalty

  11. Installation of high-voltage transmission cables.

    violationRecord 5133472

    30 CFR 75.807 · $755.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5132852

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  13. Atmospheric monitoring systems.

    violationRecord 5132851

    30 CFR 75.351(d)(2) · $226.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5132850

    30 CFR 75.503 · $177.00 proposed penalty

  15. Main mine fan stoppage with persons underground.

    violationRecord 5132849

    30 CFR 75.313(a)(1) · $151.00 proposed penalty

  16. Machinery

    accidentRecord 220262150012

    Days away from work only

    Accident narrative

    Employee was operating a roof bolter when EE pinched EE's finger.

  17. Mechanical equipment guards.

    violationRecord 5133471

    30 CFR 77.400(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5133470

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 5133469

    30 CFR 77.1605(d) · $151.00 proposed penalty

  20. Verbal Hazard Complaint Inspections

    inspectionRecord F01518A

    15.8 on-site hours reported

  21. Weekly examination.

    violationRecord 5132848

    30 CFR 75.364(g) · $151.00 proposed penalty

  22. Weekly examination.

    violationRecord 5132847

    30 CFR 75.364(h) · $151.00 proposed penalty

  23. Automatic fire warning devices; actions and response.

    violationRecord 5133468

    30 CFR 75.1103-5(a)(1) · $151.00 proposed penalty

  24. Actions for excessive methane.

    violationRecord 5132846

    30 CFR 75.323(b)(2)(ii) · $165.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5132845

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.