← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permanent splicing of trailing cables.

    violationRecord 5090337

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 5090336

    30 CFR 75.503 · $432.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F0106DC

    103(i) · 8.8 on-site hours reported

  4. Mechanical equipment guards.

    violationRecord 9839620

    30 CFR 75.1722(c) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 9839619

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  6. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 9591687

    30 CFR 75.1101-8(a) · $288.00 proposed penalty

  7. Escapeways; bituminous and lignite mines.

    violationRecord 9591686

    30 CFR 75.380(d)(1) · $4,047.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5130904

    30 CFR 75.400 · $245.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5130903

    30 CFR 75.503 · $432.00 proposed penalty

  10. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5130902

    30 CFR 75.1107-1(a)(3)(ii) · $288.00 proposed penalty

  11. Inspection of fire suppression devices.

    violationRecord 5130901

    30 CFR 75.1107-16(b) · $151.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5090331

    30 CFR 75.400 · $592.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord F006C85

    6.8 on-site hours reported

  14. Methane monitors.

    violationRecord 9839398

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F009E03

    103(i) · 8.0 on-site hours reported

  16. Permanent splicing of trailing cables.

    violationRecord 5090330

    30 CFR 75.604(b) · $3,184.00 proposed penalty

  17. Permissible electric face equipment; maintenance.

    violationRecord 5090329

    30 CFR 75.503 · $465.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5090328

    30 CFR 75.400 · $592.00 proposed penalty

  19. Inspection of fire suppression devices.

    violationRecord 5090327

    30 CFR 75.1107-16(b) · $313.00 proposed penalty

  20. Temporary notations, revisions, and supplements.

    violationRecord 5090326

    30 CFR 75.1202-1(b)(4) · $151.00 proposed penalty

  21. Rehabilitation of areas with unsupported roof.

    violationRecord 9839617

    30 CFR 75.212(c) · $959.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F009E02

    103(i) · 7.8 on-site hours reported

  23. Accumulation of combustible materials.

    violationRecord 5090325

    30 CFR 75.400 · $697.00 proposed penalty

  24. Violation — cited standard not reported

    violationRecord 5090324

    $1,066.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5090323

    30 CFR 75.400 · $9,004.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.