Mountaineer II Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 8.0 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Ventilation controls.
30 CFR 75.333(d)(3) · $288.00 proposed penalty
Weekly examination.
30 CFR 75.364(b)(4) · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $432.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $549.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
30 CFR 75.1107-1(a)(3)(ii) · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $549.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $336.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Hoists; brakes, capability.
30 CFR 75.1400-1 · $288.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $642.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $3,736.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $288.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(b) · $288.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · $288.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $288.00 proposed penalty
Non-Injury Accident Investigation
18.0 on-site hours reported
Verbal Hazard Complaint Inspections
2.0 on-site hours reported
Violation — cited standard not reported
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $1,550.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.