← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5098481

    30 CFR 75.503 · $193.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5098480

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  3. Roof control plan.

    violationRecord 5096978

    30 CFR 75.220(a)(1) · $1,550.00 proposed penalty

  4. Conventional roof support.

    violationRecord 5096977

    30 CFR 75.206(e) · $959.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F02603B

    103(i) · 11.3 on-site hours reported

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 5098479

    30 CFR 75.512 · $193.00 proposed penalty

  7. Face ventilation control devices.

    violationRecord 5096974

    30 CFR 75.330(b)(2) · $288.00 proposed penalty

  8. Permanent splicing of trailing cables.

    violationRecord 5096976

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5096975

    30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F0107F0

    643.5 on-site hours reported

  11. Spot Inspections

    inspectionRecord F006C92

    103(i) · 8.8 on-site hours reported

  12. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5096535

    30 CFR 75.1911(i) · $288.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F006C91

    103(i) · 6.8 on-site hours reported

  14. Spot Inspections

    inspectionRecord F02243B

    103(i) · 6.3 on-site hours reported

  15. Spot Inspections

    inspectionRecord 7048982

    103(i) · 7.0 on-site hours reported

  16. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5096534

    30 CFR 75.1106-3(a)(2) · $288.00 proposed penalty

  17. Quantity and location of firefighting equipment.

    violationRecord 5096533

    30 CFR 75.1100-2(e) · $151.00 proposed penalty

  18. Spot Inspections

    inspectionRecord 7048981

    103(i) · 5.8 on-site hours reported

  19. Atmospheric monitoring systems.

    violationRecord 5096532

    30 CFR 75.351(k) · $288.00 proposed penalty

  20. Atmospheric monitoring systems.

    violationRecord 5096531

    30 CFR 75.351(n)(3) · $288.00 proposed penalty

  21. Atmospheric monitoring systems.

    violationRecord 5096530

    30 CFR 75.351(n)(3) · $288.00 proposed penalty

  22. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5096529

    30 CFR 75.1731(b) · $366.00 proposed penalty

  23. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5096528

    30 CFR 75.1911(i) · $151.00 proposed penalty

  24. Spot Inspections

    inspectionRecord 7048980

    103(i) · 6.0 on-site hours reported

  25. Permissible electric face equipment; maintenance.

    violationRecord 5095864

    30 CFR 75.503 · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.