← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5096999

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  2. Frequency of examinations.

    violationRecord 5098503

    30 CFR 75.512-2 · $151.00 proposed penalty

  3. Power wires and cables; insulation and protection.

    violationRecord 5098502

    30 CFR 75.517 · Significant and substantial (S&S) · $5,574.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5098501

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5096998

    30 CFR 75.517 · $504.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5096997

    30 CFR 75.400 · $267.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5096996

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  8. Permissible electric equipment.

    violationRecord 5096995

    30 CFR 75.500(c) · $432.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F0106F3

    103(i) · 5.5 on-site hours reported

  10. Mine ventilation plan; submission and approval.

    violationRecord 9839698

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $29,904.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5098500

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5096994

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  13. Violation — cited standard not reported

    violationRecord 5096077

    $1,866.00 proposed penalty

  14. Violation — cited standard not reported

    violationRecord 5098499

    $1,866.00 proposed penalty

  15. Mechanical equipment guards.

    violationRecord 5098498

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5096993

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5098497

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5098496

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5096992

    30 CFR 75.512 · $193.00 proposed penalty

  20. Automatic emergency-parking brakes.

    violationRecord 5096991

    30 CFR 75.523-3(b)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F0106F2

    103(i) · 5.5 on-site hours reported

  22. Roof bolting.

    violationRecord 5092515

    30 CFR 75.204(c)(1) · $151.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F0107F1

    103(i) · 8.0 on-site hours reported

  24. Protection from falls of roof, face and ribs.

    violationRecord 5096990

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 5096989

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.