← Mountaineer II Mine

Mountaineer II Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 5132902

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 5132901

    30 CFR 75.503 · $165.00 proposed penalty

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5132900

    30 CFR 75.512 · $336.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5098599

    30 CFR 75.604(b) · $336.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5098598

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F029341

    103(i) · 5.5 on-site hours reported

  7. Air quality.

    violationRecord 5095226

    30 CFR 75.321(a)(1) · $226.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5098597

    30 CFR 75.503 · $165.00 proposed penalty

  9. Permissible electric face equipment; maintenance.

    violationRecord 5098596

    30 CFR 75.503 · $366.00 proposed penalty

  10. Machinery and equipment; operation and maintenance.

    violationRecord 5098595

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F03603A

    103(i) · 4.5 on-site hours reported

  12. Preshift examination at fixed intervals.

    violationRecord 5132552

    30 CFR 75.360(f) · $226.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5132551

    30 CFR 75.1731(c) · $226.00 proposed penalty

  14. Other safeguards.

    violationRecord 5132550

    30 CFR 75.1403 · $398.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5132549

    30 CFR 75.1731(a) · $245.00 proposed penalty

  16. Roof control plan.

    violationRecord 5098594

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  17. Permissible electric face equipment; maintenance.

    violationRecord 5098593

    30 CFR 75.503 · $165.00 proposed penalty

  18. Power wires and cables; insulation and protection.

    violationRecord 5098592

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5098591

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5098590

    30 CFR 75.400 · $432.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5098589

    30 CFR 75.400 · $193.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5095225

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F02933F

    103(i) · 5.5 on-site hours reported

  24. Mine ventilation plan; submission and approval.

    violationRecord 5095224

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5133420

    30 CFR 75.512 · $1,126.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.