  1. Roof control plan.

    violationRecord 5095064

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5095057

    30 CFR 75.400 · $226.00 proposed penalty

  3. Electric equipment; examination, testing, and maintenance.

    violationRecord 5095056

    30 CFR 77.502 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5095055

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  5. Roof control plan.

    violationRecord 5095054

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  6. Roof control plan.

    violationRecord 5099280

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5095047

    30 CFR 75.400 · $226.00 proposed penalty

  8. Mechanical equipment guards.

    violationRecord 5095046

    30 CFR 75.1722(a) · $151.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5095004

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  10. Permanent splicing of trailing cables.

    violationRecord 5095045

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 5095044

    30 CFR 75.512 · $177.00 proposed penalty

  12. Roof control plan.

    violationRecord 5095043

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  13. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F026035

    7.0 on-site hours reported

  14. Main mine fan operation.

    violationRecord 5098440

    30 CFR 75.311(b)(1) · $14,557.00 proposed penalty

  15. Violation — cited standard not reported

    violationRecord 5098441

    $184.00 proposed penalty

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5095037

    30 CFR 75.512 · $177.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5095036

    30 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5095035

    30 CFR 75.400 · $209.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5095033

    30 CFR 75.512 · Significant and substantial (S&S) · $883.00 proposed penalty

  20. Methane monitors.

    violationRecord 5095032

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  21. Power wires and cables; insulation and protection.

    violationRecord 5095031

    30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  22. Power wires and cables; insulation and protection.

    violationRecord 5095030

    30 CFR 75.517 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5095029

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 5095028

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5095027

    30 CFR 75.370(a)(1) · $2,712.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.