Slip or fall of person
Days away from work only
Accident narrative
Employee was walking beside the bolting machine and said that they slipped on a rock and tried to catch themselves with their left arm when they said that they heard something pop in their shoulder. The area where the incident occurred was 62" high.
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $959.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $398.00 proposed penalty
Air quality detectors and measurement devices.
30 CFR 75.320(a) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Travelways at surface installations.
30 CFR 77.205(a) · Significant and substantial (S&S) · $288.00 proposed penalty
Fire protection; training and organization.
30 CFR 77.1100 · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(1) · $151.00 proposed penalty
Respirable dust samples; report to operator; posting.
30 CFR 70.211(c) · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Installation of main mine fans.
30 CFR 75.310(a)(3) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $151.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(g) · $151.00 proposed penalty
Regular Safety and Health Inspection
134.5 on-site hours reported
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(1) · $151.00 proposed penalty
Action level.
30 CFR 62.120 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.