Michael Powellton Deep Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5091945

    30 CFR 75.601-1 · $151.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5091944

    30 CFR 75.400 · $883.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5091943

    30 CFR 75.333(h) · $151.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5091942

    30 CFR 75.400 · $398.00 proposed penalty

  5. Other safeguards.

    violationRecord 5091941

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  6. Mechanical equipment guards.

    violationRecord 5091940

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  7. Quantity and location of firefighting equipment.

    violationRecord 5091939

    30 CFR 75.1100-2(e) · $288.00 proposed penalty

  8. Roof control plan.

    violationRecord 5091938

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5091937

    30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5091936

    30 CFR 75.202(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  11. Machinery and equipment; operation and maintenance.

    violationRecord 5091935

    30 CFR 75.1725(a) · $959.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5091934

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  13. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5091933

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F022432

    149.0 on-site hours reported

  15. Verbal Hazard Complaint Inspections

    inspectionRecord F00198E

    4.0 on-site hours reported

  16. Mine ventilation plan; submission and approval.

    violationRecord 5091124

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  17. Fall of roof or back

    accidentRecord 220251820012

    No dys awy frm wrk,no rstr act

    Accident narrative

    Employee was standing behind the continuous miner when EE was struck by a piece of rock that fell from between bolts. The rock measured 23"x15"x1".

  18. Mine ventilation plan; submission and approval.

    violationRecord 5091917

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 5091916

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  20. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5091915

    30 CFR 75.601-1 · $151.00 proposed penalty

  21. Roof control plan.

    violationRecord 5091914

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5091913

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  23. Roof control plan.

    violationRecord 5091912

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  24. Machinery and equipment; operation and maintenance.

    violationRecord 5091911

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5091910

    30 CFR 75.512 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.