← MC#1 Mine

MC#1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Main mine fan operation.

    violationRecord 5016134

    30 CFR 75.311(b)(1) · Significant and substantial (S&S) · $41,184.00 proposed penalty

  2. Immediate notification.

    violationRecord 5016132

    30 CFR 50.10(d) · Significant and substantial (S&S) · $45,760.00 proposed penalty

  3. Mine emergency evacuation and firefighting program of instruction.

    violationRecord 5016131

    30 CFR 75.1502 · Significant and substantial (S&S) · $90,649.00 proposed penalty

  4. Power wires and cables; insulation and protection.

    violationRecord 5016063

    30 CFR 75.517 · $755.00 proposed penalty

  5. Machinery and equipment; operation and maintenance.

    violationRecord 5016062

    30 CFR 75.1725(a) · $193.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5016061

    30 CFR 75.400 · $336.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F03ABA2

    103(i) · 7.0 on-site hours reported

  8. Ventilation controls.

    violationRecord 5016060

    30 CFR 75.333(h) · $226.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9548766

    30 CFR 75.400 · $336.00 proposed penalty

  10. Hoists; brakes, capability.

    violationRecord 5011111

    30 CFR 75.1400-1 · $642.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F03ABA1

    103(i) · 7.0 on-site hours reported

  12. Roof Control Technical Investigation

    inspectionRecord 7019287

    96.5 on-site hours reported

  13. Machinery and equipment; operation and maintenance.

    violationRecord 5016059

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5016058

    30 CFR 75.202(a) · $245.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5016057

    30 CFR 75.400 · $336.00 proposed penalty

  16. Permanent splicing of trailing cables.

    violationRecord 9786899

    30 CFR 75.604(b) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5016147

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5016146

    30 CFR 75.370(a)(1) · $1,550.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5016145

    30 CFR 75.403 · $209.00 proposed penalty

  20. Quantity and location of firefighting equipment.

    violationRecord 9786898

    30 CFR 75.1100-2(d) · $193.00 proposed penalty

  21. Permissible electric face equipment; maintenance.

    violationRecord 9786897

    30 CFR 75.503 · $245.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F00C1B1

    103(i) · 6.5 on-site hours reported

  23. Spot Inspections

    inspectionRecord F00AFB0

    103(i) · 4.5 on-site hours reported

  24. Ventilation controls.

    violationRecord 5016140

    30 CFR 75.333(e)(1)(i) · $209.00 proposed penalty

  25. Handling of materials

    accidentRecord 220260750011

    Days away from work only

    Accident narrative

    I.E. stated EE was helping carry a material door, the door twisted in EE's hands causing a pop in EE's wrist. X-ray shown a fracture of EE's left radius.

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.