← Maxine-Pratt Mine

Maxine-Pratt Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 9709150

    30 CFR 75.202(a) · $432.00 proposed penalty

  2. Mine map.

    violationRecord 9709149

    30 CFR 75.1200 · $151.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 9709148

    30 CFR 75.380(d)(7)(vii)(A) · Significant and substantial (S&S) · $432.00 proposed penalty

  4. Installation of high-voltage transmission cables.

    violationRecord 9758149

    30 CFR 75.807 · $288.00 proposed penalty

  5. Self-rescue devices; use and location requirements.

    violationRecord 9758148

    30 CFR 75.1714-2(b) · Significant and substantial (S&S) · $642.00 proposed penalty

  6. Ventilation controls.

    violationRecord 9709147

    30 CFR 75.333(b)(3) · $151.00 proposed penalty

  7. Additional self-contained self-rescuers (SCSRs).

    violationRecord 9709146

    30 CFR 75.1714-4(c) · $432.00 proposed penalty

  8. Identification of circuit breakers.

    violationRecord 9709145

    30 CFR 75.904 · $151.00 proposed penalty

  9. Quantity and location of firefighting equipment.

    violationRecord 9709144

    30 CFR 75.1100-2(b) · $432.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord 6917460

    128.8 on-site hours reported

  11. Electric equipment; examination, testing, and maintenance.

    violationRecord 9758143

    30 CFR 77.502 · Significant and substantial (S&S) · $336.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 9758142

    30 CFR 77.400(a) · $151.00 proposed penalty

  13. Roof control plan.

    violationRecord 9824152

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  14. Investigation.

    violationRecord 9824146

    30 CFR 50.11(b) · $151.00 proposed penalty

  15. Escapeways; bituminous and lignite mines.

    violationRecord 9824145

    30 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $336.00 proposed penalty

  16. Roof control plan.

    violationRecord 9824144

    30 CFR 75.220(e) · $151.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 9709140

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $336.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 9709139

    30 CFR 75.503 · $151.00 proposed penalty

  19. Roof Control Technical Investigation

    inspectionRecord 6920858

    16.5 on-site hours reported

  20. Electric equipment; examination, testing, and maintenance.

    violationRecord 9820787

    30 CFR 77.502 · $336.00 proposed penalty

  21. Handling of materials

    accidentRecord 220251530005

    No dys awy frm wrk,no rstr act

    Accident narrative

    Two employees were lifting a welding cart onto a ride when employee felt pain in back and left knee

  22. Fall of roof or back

    accidentRecord 220251340014

    Days away from work only

    Accident narrative

    Employee was making first cut inby the intersection of #1 entry, oo3 mining section. Because of wet conditions EE was sitting on some loose material at the corner of #1 when a piece of rock measuring aprox. 30 inches by 30 inches by 2 inches thick fell from between the bolt and the rib striking the employee on the head.

  23. Records of training.

    violationRecord 9709135

    30 CFR 48.9(a) · $151.00 proposed penalty

  24. Electric equipment; examination, testing, and maintenance.

    violationRecord 9758123

    30 CFR 77.502 · $151.00 proposed penalty

  25. Inspection and cover plates.

    violationRecord 9758122

    30 CFR 77.512 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.