MINE DETAILS
MARSHALL COUNTY MINE
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Mine coordinates
- MARSHALL COUNTY MINE39.82167, -80.60722Open map ↗
Quarterly trends
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. MSHA quarterly production and employment reports.
Coal production
16,866,424reported short tons
Hours worked
3,440,333reported employee hours
Tons per hour
4.90production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 2,742,889 | 508,495 | 5.39 | 820 | 1/1 mines reporting |
| 2025 Q2 | 2,935,213 | 518,955 | 5.66 | 835 | 1/1 mines reporting |
| 2025 Q3 | 2,257,830 | 528,900 | 4.27 | 820 | 1/1 mines reporting |
| 2025 Q4 | 2,878,276 | 516,066 | 5.58 | 831 | 1/1 mines reporting |
| 2026 Q1 | 2,882,499 | 513,579 | 5.61 | 838 | 1/1 mines reporting |
| 2026 Q2 | 3,169,717 | 854,338 | 3.71 | 862 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
Safety and enforcement
2025-01-01 – 2026-10-18
Violations
1,616232 significant & substantial (S&S)
Accident records
3410 records classified as fatality
Proposed penalties · USD
1,061,969.001,463 of 1,616 violations with amounts
On-site inspection hours
8,033.00301 inspections · 301 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 177 | 28 | 121,748.00 | 52 | 0 | 43 | 1,107.3 |
| 2025-Q2 | 205 | 24 | 107,977.00 | 44 | 0 | 36 | 1,268.3 |
| 2025-Q3 | 224 | 27 | 145,166.00 | 52 | 0 | 54 | 1,176.3 |
| 2025-Q4 | 137 | 18 | 88,171.00 | 39 | 0 | 37 | 977.3 |
| 2026-Q1 | 163 | 19 | 168,793.00 | 44 | 0 | 37 | 1,009.3 |
| 2026-Q2 | 324 | 54 | 276,558.00 | 53 | 0 | 39 | 1,152.3 |
| 2026-Q3 | 357 | 57 | 153,556.00 | 57 | 0 | 49 | 1,258.5 |
| 2026-Q4 * | 29 | 5 | — | 0 | 0 | 6 | 84.0 |
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
Safety activity
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
IE was a passenger in a mantrip that was travelling into a track spur. The mantrip struck a dolly that was unseen by the driver, and IE's back struck EE's seat hard. Employee continued to work without restriction until seeking medical attention on 4/24/2026, and began missing days after that. Injury was not the result of a training or compliance issue.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was loading waterline onto scoop for belt move. When one of the water lines pipes slid off the scoop and struck EE's foot. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was drilled hole for rib pin and turned around to grab strap when piece of rib hit EE's back and shoulder. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was cleaning on LW face when another employee was attempting to pass EE, that employee slipped and fell and the miner that was cleaning tried to catch EE and injured EE's back. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was working on LW face at 12 shield when rock came over handrail and struck the back of their leg. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was helping hang miner cable and water line into a roller hanger when they felt pop in their upper arm (bicep). PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was working on a cable repair when knife slipped and cut their finger, causing them to receive stitches. PPE was a factor, mining systems was a factor, compliance with rules and regulations was not a factor.
FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was at the miner when a piece of rock fell from between straps and struck the top of EE's foot causing a contusion. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was working on shearer spray arm, when lifting eye that come a long was hooked to broke causing lifting eye to hit their hand. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was helping use cobra drill when drill was collapsing, they strained their shoulder. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor. Employee did not start missing until April 6th.
POWERED HAULAGE · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was operating mantrip dragging slick line when rope that was attached to pipe broke and piece of metal from rope struck EE's elbow. PPE was not a factor, mining systems was not a factor, compliance with rule and regulations was not a factor.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was helping switch cars in belt spur when motorman #2 pushed cars towards EE. EE was standing near motor when EE's foot was injured. PPE was not a factor, mining systems was not an issue, compliance with rules and regulations was not an issue. Body placement was an issue.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was sitting in a track spur when another mantrip came into spur and struck EE's ride. Causing injury to EE's head and chest. PPE was not a factor, mining systems was not a factor.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was sitting in a track spur when another mantrip came into ride and struck EE's ride. Causing contusion to EE's back and shoulder. PPE was not a factor, mining systems was not a factor.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was riding in mantrip when the mantrip went into a spur and struck another ride, injuring employee's back and neck. PPE was not a factor; mining systems was not a factor.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
IE was travelling on the mainline track on a golf cart and encountered a motor trip travelling toward them. They attempted to get out of the way but was unable, and was struck by the motor.
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was rib pinning when vent tube fell and knocked them down, causing them to injure a hand, PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was re railing a car when car shifted and pinched finger between car and jack. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was working on taking green pump hose apart when EE's knife slipped and cut the back of EE's leg (calf). PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
STEPPING OR KNEELING ON OBJECT · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee stepped down off of motor when EE stepped on a piece of coal and injured EE's ankle. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was spotting rollers and shoveling belt when EE felt pain in EE's hand. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was cleaning at belt tail when EE stepped into a hole and twisted EE's ankle. EE also fell and injured EE's wrist. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
OCCUPATIONAL SKIN DISEASES · OCCUPATNAL ILLNESS NOT DEG 1-6
Accident narrative
IE experienced skin irritation after exposure to water over the boots while searching for a damaged coupler. Incident was not the result of a training or compliance issue.
OCCUPATIONAL SKIN DISEASES · OCCUPATNAL ILLNESS NOT DEG 1-6
Accident narrative
IE experienced skin irritation after exposure to water over the boots while searching for a damaged coupler. Incident was not the result of a training or compliance issue.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was operating dump truck when it became stuck in mud. While attempting to get pushed out of mud by another piece of equipment, the dump truck moved or jolted causing employee to injure their neck. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Safety sources and definitions
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Coal shipments and quality
Receipts reported by power plants and terminals, matched by MSHA mine ID.
Quarterly receipts and quality
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 1,322,383 | 12,665 | 3.05 | 8.34 | 65.21 | |
| 2025-Q4 | 3,036,199 | 12,705 | 3.22 | 8.27 | 65.31 | |
| 2026-Q1 | 2,192,516 | 12,767 | 3.00 | 8.01 | 57.33 | |
| 2026-Q2 | 1,693,165 | 12,682 | 2.67 | 8.36 | 59.62 | |
| 2026-Q3 * | 721,624 | 12,751 | 3.29 | 8.41 | 65.26 |
| Month / source | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11548 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 17,031 | 46.88 | 12,788 | 2.73 | 8.60 | ContractBIT | River |
| 2026-07EIA row 11555 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 42,444 | 60.89 | 12,702 | 2.44 | 8.80 | ContractBIT | River |
| 2026-07EIA row 11557 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 33,102 | 54.89 | 12,689 | 2.69 | 8.70 | ContractBIT | River |
| 2026-07EIA row 11769 · preliminary | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 17,363 | —Not published | 12,775 | 2.69 | 8.40 | ContractBIT | River |
| 2026-07EIA row 11775 · preliminary | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 4,945 | —Not published | 12,802 | 2.75 | 8.50 | ContractBIT | River |
| 2026-07EIA row 11776 · preliminary | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,766 | —Not published | 12,693 | 2.62 | 8.90 | ContractBIT | River |
| 2026-07EIA row 11780 · preliminary | Miami Fort2832 · OH · BLACKHAWK COAL SALES, LLC | 3,285 | —Not published | 12,659 | 3.22 | 8.70 | SpotBIT | River |
| 2026-07EIA row 11784 · preliminary | Miami Fort2832 · OH · AMERICAN ENERGY | 45,836 | —Not published | 12,711 | 2.39 | 8.70 | SpotBIT | River |
| 2026-07EIA row 11785 · preliminary | Miami Fort2832 · OH · AMERICAN ENERGY | 38,624 | —Not published | 12,767 | 2.29 | 8.30 | SpotBIT | River |
| 2026-07EIA row 11790 · preliminary | Kyger Creek2876 · OH · ACNR COAL SALES, Inc. | 75,757 | 53.53 | 12,667 | 4.32 | 8.40 | ContractBIT | River |
| 2026-07EIA row 11932 · preliminary | FirstEnergy Fort Martin Power Station3943 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 30,467 | 104.78 | 13,082 | 3.61 | 7.90 | ContractBIT | River |
| 2026-07EIA row 11935 · preliminary | FirstEnergy Fort Martin Power Station3943 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 24,776 | 85.68 | 13,118 | 3.46 | 7.70 | ContractBIT | River |
| 2026-07EIA row 11937 · preliminary | FirstEnergy Fort Martin Power Station3943 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 13,614 | 79.76 | 12,965 | 3.50 | 7.30 | ContractBIT | River |
| 2026-07EIA row 11942 · preliminary | Mitchell (WV)3948 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 11,986 | 59.64 | 12,750 | 2.82 | 8.70 | ContractBIT | Tram/conveyor |
| 2026-07EIA row 11943 · preliminary | Mitchell (WV)3948 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 47,944 | 60.34 | 12,800 | 2.52 | 8.49 | ContractBIT | Tram/conveyor |
| 2026-07EIA row 11944 · preliminary | Mitchell (WV)3948 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 55,010 | 67.73 | 12,760 | 2.65 | 8.58 | ContractBIT | Tram/conveyor |
| 2026-07EIA row 11999 · preliminary | Pleasants Power Station6004 · WV · ACNR COAL SALES, Inc. | 8,303 | —Not published | 12,660 | 2.66 | 9.00 | SpotBIT | River |
| 2026-07EIA row 12219 · preliminary | Mountaineer6264 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 854 | 54.50 | 12,605 | 2.20 | 8.83 | ContractBIT | River |
| 2026-07EIA row 12487 · preliminary | Gavin Power, LLC8102 · OH · ACNR COAL SALES, Inc. | 208,784 | —Not published | 12,687 | 4.15 | 8.30 | ContractBIT | River |
| 2026-07EIA row 13113 · preliminary | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 25,733 | —Not published | 12,785 | 2.55 | 8.60 | ContractBIT | River / Truck |
| 2026-06EIA row 9584 · preliminary | Clifty Creek983 · IN · ACNR COAL SALES, Inc. | 27,753 | 57.74 | 12,617 | 3.58 | 8.40 | ContractBIT | River |
| 2026-06EIA row 9656 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 8,871 | 45.75 | 12,680 | 3.08 | 8.30 | ContractBIT | River |
| 2026-06EIA row 9663 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 47,299 | 59.81 | 12,710 | 1.83 | 8.60 | ContractBIT | River |
| 2026-06EIA row 9666 · preliminary | Ghent1356 · KY · ACNR COAL SALES, Inc. | 34,689 | 53.74 | 12,728 | 1.81 | 8.30 | ContractBIT | River |
| 2026-06EIA row 9876 · preliminary | Cardinal2828 · OH · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 5,328 | —Not published | 12,663 | 3.51 | 8.50 | ContractBIT | River |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Coverage, sources and calculations
- Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
- Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
- Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
- Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
- USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
- Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
- 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
- 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs
EIA ANNUAL COAL REPORT · 2024
Coal prices and estimated revenue
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Marshall County Mine4601437 · Marshall, West Virginia | 9,000,360 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Method, assumptions and source records
- This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
- Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
- The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
- FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
- Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
- County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
- Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
OWNERSHIP
Operator and controller history
Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.
ACNR Holdings, InccontrolsThe Marshall County Coal CompanyoperatesMARSHALL COUNTY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 4601437ACNR Holdings, InccontrolsMarshall County Coal Resources, Inc.operatesMARSHALL COUNTY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 4601437Robert E MurraycontrolsThe Marshall County Coal CompanyoperatesMARSHALL COUNTY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 4601437Robert E MurraycontrolsMcElroy Coal CompanyoperatesMARSHALL COUNTY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 4601437CONSOL Energy InccontrolsMcElroy Coal CompanyoperatesMARSHALL COUNTY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 4601437Other historical summaries · source-specific periods
RECORD SUMMARY
Production, safety and enforcement
These summaries use the periods stated on each card, independently of the reporting period above.
Accidents and injuries
2,389 historical accident/injury rows; 9 coded fatalities and 115,593 lost days across the published record.
accidentsmine-production-quarterlyViolations and penalties
21,056 violation rows across the full record; 6,027 carry an S&S flag and $15,159,896 appears in current assessed amounts.
inspectionsviolationsassessed-violationsorders-107aOccupational health samples
24,523 coal dust; 616 coal quartz; 1,247 noise. 0 personal-sample rows have a published C/E ratio above 1; 355 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
coal-dust-samplesquartz-samplesnoise-samplesQuarterly production and employment
854K employee hours and 862 summed average employees across reported subunits in the latest published quarter.
mine-production-quarterlymine-production-yearlyContests, conferences and decisions
6,181 contested-violation rows, 6,184 civil-penalty docket/decision rows, and 3,931 conference records linked by issuance number.
conferencescontested-violationscivil-penalty-dockets-decisionsContractors
Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
contractor-production-quarterlycontractor-production-yearlyaccidentsviolationsInspections
3,445 inspection events and 197K published inspection hours across the historical record.
inspectionsviolationsHEALTH SAMPLING
Silica and quartz
Coal quartz, metal/nonmetal personal samples and area samples. Snapshot Oct 18, 2026. 616 silica records across the mine’s published history.
Coal quartz concentration
Quarterly mean · µg/m³ · not-voided samples
— No eligible measurements. * Quarter in progress. Means describe the available samples, not average exposure across the mine.
Quartz % is the sample’s quartz content; µg/m³ is its reported concentration. Personal C/E is the ratio to the limit published with that sample. Personal and area concentration units and void status are not specified in those source files.
| Date / sample | Dataset / analyte | Occupation / area | Measurement | Sample status | Published action |
|---|---|---|---|---|---|
| 58602878 / lab 2026033600 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 6 µg/m³4.4% quartz | Not voided | Not reported |
| 58602872 / lab 2026033599 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 8 µg/m³4.1% quartz | Not voided | Not reported |
| 58602797 / lab 2026033657 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 12 µg/m³2.9% quartz | Not voided | Not reported |
| 58603089 / lab 2026032414 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 4 µg/m³3.7% quartz | Not voided | Not reported |
| 58602787 / lab 2026032413 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 9 µg/m³2.6% quartz | Not voided | Not reported |
| 58602885 / lab 2026032423 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 9 µg/m³2.5% quartz | Not voided | Not reported |
| 58602869 / lab 2026032419 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 24 µg/m³5.1% quartz | Not voided | Not reported |
| 58603070 / lab 2026030508 | Coal quartzQuartz | ELECTRICIANDESIGNATED WORK POSITION | 0 µg/m³—% quartz | Not voided | Not reported |
| 58603019 / lab 2026030228 | Coal quartzQuartz | LONGWALL OPERATOR (TAILGATE SIDE)DESIGNATED OCCUPATION | 17 µg/m³2.2% quartz | Not voided | Not reported |
| 58603030 / lab 2026030225 | Coal quartzQuartz | MECHANICNON DESIGNATED OCCUPATION | 6 µg/m³4.3% quartz | Not voided | Not reported |
| 58603001 / lab 2026030227 | Coal quartzQuartz | JACK SETTER (LONGWALL)NON DESIGNATED OCCUPATION | 15 µg/m³2.6% quartz | Not voided | Not reported |
| 58599718 / lab 2026029074 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 10 µg/m³2.4% quartz | Not voided | Not reported |
| 58599763 / lab 2026028079 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 20 µg/m³3.3% quartz | Not voided | Not reported |
| 58600125 / lab 2026028078 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 15 µg/m³2.7% quartz | Not voided | Not reported |
| 58600117 / lab 2026026754 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 8 µg/m³4.4% quartz | Not voided | Not reported |
| 58599708 / lab 2026026757 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 6 µg/m³4% quartz | Not voided | Not reported |
| 58599815 / lab 2026026715 | Coal quartzQuartz | BULLDOZER OPERATORDESIGNATED WORK POSITION | 11 µg/m³6.4% quartz | Not voided | Not reported |
| 58599808 / lab 2026021552 | Coal quartzQuartz | JACK SETTER (LONGWALL)NON DESIGNATED OCCUPATION | 25 µg/m³2.9% quartz | Not voided | Not reported |
| 58599886 / lab 2026021553 | Coal quartzQuartz | LONGWALL OPERATOR (TAILGATE SIDE)DESIGNATED OCCUPATION | 27 µg/m³2.5% quartz | Not voided | Not reported |
| 58599804 / lab 2026019678 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 32 µg/m³3.3% quartz | Not voided | Not reported |
Sources and interpretation
- Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
- Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
- Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
- Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
- Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.
Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗
EIA + TITLE 30
EIA production and cited regulations
EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.
- LABOR HOURS
- 2,093,351
- AVG EMPLOYEES
- 848
- SUPPLY REGION
- Appalachia Northern
- UNION
- United Mine Workers Of America
- OPERATION
- Mine and Preparation Plant
- COMPANY TYPE
- Operating Subsidiary
1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.
RECENT PUBLIC RECORDS
Recent violations and samples
Latest records retained for inspection; aggregates above use the full source history.
Coal dust, noise and other contaminants. Silica records above ↑
SOURCE COVERAGE
Reporting dates and coverage
17 datasets contain linked records. Missing datasets are listed below.
NOTES
Limitations
- Contractor production is entity-level and is never represented as mine-attributable.
- Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.