Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $177.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $165.00 proposed penalty
Conventional roof support.
30 CFR 75.206(e) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $165.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
An unplanned roof fall occurred on 7/27/2026 at 2:35pm. The fall measured 16' wide by 85' long by 8' high. The fall occurred in 5 North Mains #4 Entry at 69 to 70xc. The area was posted on all sides, dangered off, and will not be cleaned up.
Spot Inspections
103(i) · 8.5 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $504.00 proposed penalty
Warning devices.
30 CFR 75.208 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $2,312.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $209.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was mounting a dust box on CM Bolter station when dust box dropped and landed on employees finger. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Machinery
Days away from work only
Accident narrative
Employee was standing on the back of miner getting a roof strap when the operator did not see the employee and lowered the boom of the miner down on top of the employee's foot. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Handling of materials
Days away from work only
Accident narrative
Employee injured right biceps while moving a piece of large rock. They worked unrestricted until 8/2/26, began missing work 8/3/26. This incident did not involve any aspect of compliance with rules and regulations; mine equipment or mining system; job skills and miner proficiency, training and attitude; or protective items relating to clothing, or protective devices on equipment.
Roof control plan.
30 CFR 75.220(a)(1) · $366.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.