← MARSHALL COUNTY MINE

MARSHALL COUNTY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspections

    inspectionRecord F041911

    103(i) · 8.0 on-site hours reported

  2. Protection from falls of roof, face and ribs.

    violationRecord 5120552

    30 CFR 75.202(a) · Significant and substantial (S&S)

  3. Temporary, portable containers.

    violationRecord 5120551

    30 CFR 47.44(b)

  4. Criteria—Track haulage roads.

    violationRecord 5120550

    30 CFR 75.1403-8(d) · Significant and substantial (S&S)

  5. Other safeguards.

    violationRecord 5120549

    30 CFR 75.1403

  6. Ventilation controls.

    violationRecord 5120548

    30 CFR 75.333(h)

  7. Other safeguards.

    violationRecord 5120547

    30 CFR 75.1403

  8. Protection from falls of roof, face and ribs.

    violationRecord 5121255

    30 CFR 75.202(a)

  9. Criteria—Track haulage roads.

    violationRecord 5121254

    30 CFR 75.1403-8(d)

  10. Criteria—Belt conveyors.

    violationRecord 5120443

    30 CFR 75.1403-5(g)

  11. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5120441

    30 CFR 75.1106-3(a)(2)

  12. Criteria—Track haulage roads.

    violationRecord 5120440

    30 CFR 75.1403-8(d)

  13. Powered haulage

    accidentRecord 220262920004

    Days away from work only

    Accident narrative

    Employee had hand on the back of the Scoop bucket when the plow was retracted, causing the employee's finger to become caught. PPE was a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.

  14. Handling of materials

    accidentRecord 220262920003

    Days away from work only

    Accident narrative

    Employee was building a wall, the employee's glove became caught beneath a block. As the employee pulled hand free, the block fell, striking the employee on the shoulder. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.

  15. Roof Control Technical Investigation

    inspectionRecord F012939

    9.0 on-site hours reported

  16. Communications facilities; refuge alternatives.

    violationRecord 9584700

    30 CFR 75.1600-3(a)(1)

  17. Refuge alternatives.

    violationRecord 9584699

    30 CFR 75.1506(h)(1)

  18. Protection from falls of roof, face and ribs.

    violationRecord 5156738

    30 CFR 75.202(a)

  19. Roof control plan.

    violationRecord 5156737

    30 CFR 75.220(a)(1)

  20. Roof control plan.

    violationRecord 5156736

    30 CFR 75.220(a)(1)

  21. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5156735

    30 CFR 75.701

  22. Power wires and cables; insulation and protection.

    violationRecord 5121253

    30 CFR 75.517 · Significant and substantial (S&S)

  23. Permanent splicing of trailing cables.

    violationRecord 5121252

    30 CFR 75.604(b) · Significant and substantial (S&S)

  24. Roof control plan.

    violationRecord 5121251

    30 CFR 75.220(a)(1)

  25. Accumulation of combustible materials.

    violationRecord 5121250

    30 CFR 75.400 · Significant and substantial (S&S)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.