MARSHALL COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $883.00 proposed penalty
Machinery
Days away from work only
Accident narrative
Employee was helping Z-Drill on the Longwall face when a rock fell from the face, striking the employee in the lower left leg resulting in a fractured fibula. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
103(i) · 10.3 on-site hours reported
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · $177.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $313.00 proposed penalty
Criteria—Haulage; general.
30 CFR 75.1403-10(e) · $165.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $658.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $504.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $1,037.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $465.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(b)(3) · $209.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $177.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $592.00 proposed penalty
Non-Injury Accident Investigation
4.0 on-site hours reported
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · $336.00 proposed penalty
Preshift examination at fixed intervals.
30 CFR 75.360(b) · $313.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $398.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $697.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.