← Maple Eagle No. 1 Mine

Maple Eagle No. 1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 9841427

    30 CFR 75.503 · $151.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5022807

    30 CFR 75.512 · Significant and substantial (S&S) · $4,383.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5022806

    30 CFR 75.604(b) · $959.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5022805

    30 CFR 75.503 · $151.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 5022804

    30 CFR 75.604(b) · $959.00 proposed penalty

  6. Clamping of trailing cables to equipment.

    violationRecord 5022803

    30 CFR 75.605 · $226.00 proposed penalty

  7. Machinery and equipment; operation and maintenance.

    violationRecord 5022802

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $755.00 proposed penalty

  8. Dry chemical devices; capacity; minimum requirements.

    violationRecord 9841426

    30 CFR 75.1107-9(b) · $151.00 proposed penalty

  9. Roof control plan.

    violationRecord 9841425

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5025120

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5025119

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5025118

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  13. Roof control plan.

    violationRecord 5025117

    30 CFR 75.220(a)(1) · $288.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 5025116

    30 CFR 75.503 · $267.00 proposed penalty

  15. Roof control plan.

    violationRecord 5025115

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5022801

    30 CFR 75.400 · $465.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord 6322080

    501.3 on-site hours reported

  18. Mine ventilation plan; submission and approval.

    violationRecord 5025114

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  19. Construction and repair of seals.

    violationRecord 5025113

    30 CFR 75.337(d) · $755.00 proposed penalty

  20. Verbal Hazard Complaint Inspections

    inspectionRecord 6322076

    4.5 on-site hours reported

  21. Spot Inspection

    inspectionRecord 6322077

    28.5 on-site hours reported

  22. Mine ventilation plan; submission and approval.

    violationRecord 5025112

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  23. Weekly examination.

    violationRecord 5025111

    30 CFR 75.364(b)(2) · $226.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5025110

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5025109

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.