← Maple Eagle No. 1 Mine

Maple Eagle No. 1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mining methods.

    violationRecord 5029938

    30 CFR 75.203(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5029066

    30 CFR 75.512 · $336.00 proposed penalty

  3. Roof control plan.

    violationRecord 5029937

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5029936

    30 CFR 75.503 · $267.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5029935

    30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  6. Protection of trailing cables.

    violationRecord 5029934

    30 CFR 75.606 · $366.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 5029933

    30 CFR 75.517 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 5029932

    30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5029065

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029064

    30 CFR 75.1731(a) · $267.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5029063

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  12. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5029062

    30 CFR 75.1731(a) · $267.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5029061

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5029060

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  15. Roof control plan.

    violationRecord 5029059

    30 CFR 75.220(a)(1) · $959.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5029058

    30 CFR 75.202(a) · Significant and substantial (S&S) · $17,082.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5029057

    30 CFR 75.370(a)(1) · $1,679.00 proposed penalty

  18. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5029931

    30 CFR 75.1107-1(a)(1) · $366.00 proposed penalty

  19. Ventilation controls.

    violationRecord 5029930

    30 CFR 75.333(h) · $226.00 proposed penalty

  20. Escapeways; bituminous and lignite mines.

    violationRecord 5029929

    30 CFR 75.380(d)(7)(vii) · $165.00 proposed penalty

  21. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5029928

    30 CFR 75.1101-8(a) · $165.00 proposed penalty

  22. Electric equipment; examination, testing and maintenance.

    violationRecord 5029927

    30 CFR 75.512 · $288.00 proposed penalty

  23. Installation of water sprinkler systems; requirements.

    violationRecord 5029926

    30 CFR 75.1101-7(a) · $165.00 proposed penalty

  24. Quantity and location of firefighting equipment.

    violationRecord 5029925

    30 CFR 75.1100-2(a)(1) · $165.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 5029056

    30 CFR 75.604(b) · $642.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.