← Mach #1 Mine

Mach #1 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9786685

    30 CFR 75.1910(d) · $245.00 proposed penalty

  2. Handling of materials

    accidentRecord 220251600017

    Days away from work only

    Accident narrative

    I.E. was recovering belt structure when they felt a pop and pain in right shoulder.

  3. Roof control plan.

    violationRecord 9548749

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  4. Spot Inspections

    inspectionRecord 7031392

    103(i) · 7.3 on-site hours reported

  5. Mine ventilation plan; submission and approval.

    violationRecord 9786684

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  6. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786767

    30 CFR 75.1909(a)(1) · $245.00 proposed penalty

  7. Other safeguards.

    violationRecord 9786766

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  8. Handling of materials

    accidentRecord 220251560019

    Days away from work only

    Accident narrative

    I.E was building cribs in HG 17 bleeder near a regulator and felt something get blown into their eye.

  9. Spot Inspections

    inspectionRecord F005A45

    103(i) · 8.0 on-site hours reported

  10. Mine ventilation plan; submission and approval.

    violationRecord 9786765

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 9786764

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9786763

    30 CFR 75.400 · $465.00 proposed penalty

  13. Insulating mats at power switches.

    violationRecord 9786683

    30 CFR 77.513 · $818.00 proposed penalty

  14. Electric equipment; examination, testing and maintenance.

    violationRecord 9786682

    30 CFR 75.512 · $366.00 proposed penalty

  15. Permissible electric face equipment; maintenance.

    violationRecord 9786681

    30 CFR 75.503 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  16. Spot Inspections

    inspectionRecord 7031391

    103(i) · 6.3 on-site hours reported

  17. Mine ventilation plan; submission and approval.

    violationRecord 9786680

    30 CFR 75.370(a)(1) · $1,126.00 proposed penalty

  18. Handling of materials

    accidentRecord 220251530004

    No dys awy frm wrk,no rstr act

    Accident narrative

    I.E. was attempting to move a top roller and a roller came loose and pinched EE's small finger.

  19. Spot Inspections

    inspectionRecord F005A44

    103(i) · 6.0 on-site hours reported

  20. Roof Control Technical Investigation

    inspectionRecord 7019278

    55.5 on-site hours reported

  21. Permanent splicing of trailing cables.

    violationRecord 9786762

    30 CFR 75.604(b) · Significant and substantial (S&S) · $13,436.00 proposed penalty

  22. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9786761

    30 CFR 75.1910(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty

  23. Handtools (nonpowered)

    accidentRecord 220251430015

    No dys awy frm wrk,no rstr act

    Accident narrative

    I.E. was struck by a small piece of metal in the back of their left arm that came off of a hammer being used behind them.

  24. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9786760

    30 CFR 75.1909(d) · $245.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 9786679

    30 CFR 75.517 · Significant and substantial (S&S) · $13,436.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.