← Lower War Eagle

Lower War Eagle safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Dust accumulations in surface installations.

    violationRecord 5186099

    30 CFR 77.202 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  2. Surface installations; general.

    violationRecord 5186098

    30 CFR 77.200 · $245.00 proposed penalty

  3. Condition and examination of firefighting equipment.

    violationRecord 5093483

    30 CFR 75.1100-3 · $151.00 proposed penalty

  4. Other safeguards.

    violationRecord 5093482

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  5. Other safeguards.

    violationRecord 5093481

    30 CFR 75.1403 · $151.00 proposed penalty

  6. Roof control plan.

    violationRecord 5093476

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  7. Permanent splicing of trailing cables.

    violationRecord 5093480

    30 CFR 75.604(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5093479

    30 CFR 75.400 · $504.00 proposed penalty

  9. Permanent splicing of trailing cables.

    violationRecord 5093478

    30 CFR 75.604(b) · Significant and substantial (S&S) · $7,084.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5093477

    30 CFR 75.503 · $177.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F00D98F

    103(i) · 9.8 on-site hours reported

  12. Power wires and cables; insulation and protection.

    violationRecord 5093475

    30 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  13. Approval of other fire suppression devices.

    violationRecord 5093474

    30 CFR 75.1107-13(g) · $151.00 proposed penalty

  14. Methane monitors.

    violationRecord 5093473

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  15. Permanent splicing of trailing cables.

    violationRecord 5093472

    30 CFR 75.604(b) · $165.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5093471

    30 CFR 75.400 · $432.00 proposed penalty

  17. Roof control plan.

    violationRecord 5093470

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  18. Roof control plan.

    violationRecord 5131733

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  19. Identification of circuit breakers.

    violationRecord 5131732

    30 CFR 75.904 · $313.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F0106F1

    103(i) · 4.5 on-site hours reported

  21. Other safeguards.

    violationRecord 5093469

    30 CFR 75.1403 · $151.00 proposed penalty

  22. Mechanical equipment guards.

    violationRecord 5093468

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5093467

    30 CFR 75.400 · $193.00 proposed penalty

  24. Quantity and location of firefighting equipment.

    violationRecord 5093466

    30 CFR 75.1100-2(b) · $209.00 proposed penalty

  25. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5093465

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.