Lower War Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(e) · $151.00 proposed penalty
Automatic fire sensors; approved components; installation requirements.
30 CFR 75.1103-2(a) · $151.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(a)(1) · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $193.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Spot Inspections
103(i) · 8.3 on-site hours reported
Roof testing and scaling.
30 CFR 75.211(d) · $209.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Regular Safety and Health Inspection
399.8 on-site hours reported
Spot Inspections
103(i) · 5.5 on-site hours reported
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Spot Inspections
103(i) · 8.3 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Non-Injury Accident Investigation
8.5 on-site hours reported
Violation — cited standard not reported
Immediate notification.
30 CFR 50.10(d) · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $432.00 proposed penalty
Fall of roof or back
Accident only
Accident narrative
A fall occurred on September 10, 2025, in-by survey station No. 11515 in the No.22 pillar block. The fall was approximately 8' thick.
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.