MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 17, 2026

MINE DETAILS

Little Italy

ActiveSurfaceCoal (Anthracite)
MSHA MINE ID3608593
LOCATIONCarbon, PA
PUBLIC RECORD1,097 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

6

0 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q22
  7. 2026 Q31
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

906.00

6 of 6 violations with amounts

  1. 2025 Q1151
  2. 2025 Q2151
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1151
  6. 2026 Q2302
  7. 2026 Q3151
  8. 2026 Q4 *—

On-site inspection hours

237.50

10 inspections · 10 with hours

  1. 2025 Q158.75
  2. 2025 Q247.00
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q155.75
  6. 2026 Q253.50
  7. 2026 Q322.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110151.0010258.8
2025-Q210151.0000147.0
2025-Q300—000—
2025-Q400—000—
2026-Q110151.0010255.8
2026-Q220302.0000253.5
2026-Q310151.0000322.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF026226

    Spot Inspection · 10.5 on-site hours

  2. inspectionF018411

    Spot Inspection · 12.0 on-site hours

  3. inspectionF02B115

    Spot Inspection · 0.0 on-site hours

  4. violation5154679

    71.207(c) · $151.00 proposed

  5. violation9606209

    77.1110 · $151.00 proposed

  6. inspectionF018408

    Regular Safety and Health Inspection · 53.5 on-site hours

  7. inspectionF02B0ED

    Spot Inspection · 0.0 on-site hours

  8. violation5154614

    71.206(a) · $151.00 proposed

  9. inspectionF02536B

    Spot Inspection · 10.3 on-site hours

  10. accident220260570011

    HANDLING OF MATERIALS · DAYS RESTRICTED ACTIVITY ONLY

    Accident narrative

    While assisting welder to pull tooth out of metal bin for 6015B bucket, tooth slipped pinching employees right index finger against metal bin. employee was taken to local urgent care for observation and diagnosed with laceration to right index finger.

  11. violation5155605

    77.1102 · $151.00 proposed

  12. inspectionF006FBF

    Regular Safety and Health Inspection · 45.5 on-site hours

  13. violation9603878

    47.44(b) · $151.00 proposed

  14. inspectionF01809D

    Regular Safety and Health Inspection · 47.0 on-site hours

  15. inspectionF01753C

    Spot Inspection · 10.3 on-site hours

  16. accident220250420017

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Miner was laying out explosives and slipped and fell on pit floor.

  17. violation9603792

    77.1606(c) · $151.00 proposed

  18. inspectionF017532

    Regular Safety and Health Inspection · 48.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-17 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-17. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Little Italy3608593 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYRobindale Energy Services Inc → Lehigh Anthracite Coal, LLC → Little Italy
HISTORY RECORDS39 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Robindale Energy Services InccontrolsLehigh Anthracite Coal, LLCoperatesLittle Italy

msha-controller-operator-history · controller/operator co-tenure derived on mine 3608593
—

Robert E YargercontrolsKAMCoperatesLittle Italy

msha-controller-operator-history · controller/operator co-tenure derived on mine 3608593
—

Mary C NardinicontrolsR & F Nardini Coal CompanyoperatesLittle Italy

msha-controller-operator-history · controller/operator co-tenure derived on mine 3608593
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

8 historical accident/injury rows; 0 coded fatalities and 409 lost days across the published record.

ACCIDENT + INJURY RECORD5 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

40 violation rows across the full record; 4 carry an S&S flag and $5,354 appears in current assessed amounts.

ENFORCEMENT ACTIVITY17 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHcontext

Occupational health samples

439 coal dust; 10 coal quartz; 149 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE598 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

0 employee hours and 0 summed average employees across reported subunits in the latest published quarter.

2002-Q40 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

1 contested-violation rows, 1 civil-penalty docket/decision rows, and 1 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE3 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT1 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

79 inspection events and 3K published inspection hours across the historical record.

OVERSIGHT COVERAGE21 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records11 coal · 0 personal · 0 area
Sample status1 not voided0 voided · 0 status not reported
Mean coal quartz concentration13 µg/m³1 eligible measurements · 0 missing concentration
2026 · Jan 28, 2026–Jan 28, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58567332 / lab 2026003547Coal quartzQuartzHIGHWALL DRILL OPERATORDESIGNATED WORK POSITION13 µg/m³7.5% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
515467971.207(c)Citation
960620977.1110Citation
515461471.206(a)Citation
515560577.1102Citation
960387847.44(b)Citation
960379277.1606(c)Citation
920982377.1600(b)Citation
920945177.208(d)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustHIGHWALL DRILL OPERATOR
.054 mg/m³Not voided
NoiseHIGHWALL DRILL OPERATOR
PEL dose: 7%Action-level dose: 27%
Coal dustHIGHWALL DRILL OPERATOR
.146 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.051 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.045 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.003 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.022 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.033 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors8Jul 21, 2007—Feb 13, 2026mine-keyed
Addresses of Recordidentity · logistics1Apr 18, 2016—Apr 18, 2016mine-keyed
Assessed Violationscompliance · legal39Mar 21, 2007—Jul 27, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal1Feb 26, 2013—Feb 26, 2013mine-keyed
Coal Dust Sampleshealth · safety439Aug 8, 2001—Aug 25, 2026mine-keyed
Conferencescompliance · legal1Jul 21, 2026—Jul 21, 2026mine-keyed
Contested Violationscompliance · legal1Mar 20, 2012—Mar 20, 2012mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety230Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety57Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance3Nov 1, 1996—Sep 18, 2015mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance12Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance26Not published—Not publishedmine-keyed
Inspectionssafety · compliance79Mar 15, 2000—Aug 25, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment149Mar 15, 2000—Aug 25, 2026mine-keyed
Quartz Samples — Coalhealth · safety10May 1, 2007—Jan 28, 2026mine-keyed
Violationscompliance · safety · legal40Mar 21, 2007—Jul 27, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.