LICK CREEK HAGY safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $336.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
On-shift examination.
30 CFR 75.362(g)(1) · $151.00 proposed penalty
Regular Safety and Health Inspection
214.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $151.00 proposed penalty
Spot Inspection
21.5 on-site hours reported
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
30 CFR 75.523-1(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.
30 CFR 75.1714-3(a) · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
On-shift examination.
30 CFR 75.362(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
76.8 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
While taking surface waterline apart the clamp came apart hitting employee in the right side of chest.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.