← Leer South Mine

Leer South Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 9938582

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 9938581

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9938580

    30 CFR 75.400 · $883.00 proposed penalty

  4. Ventilation controls.

    violationRecord 9938395

    30 CFR 75.333(h) · $193.00 proposed penalty

  5. Ventilation controls.

    violationRecord 9938394

    30 CFR 75.333(c) · $504.00 proposed penalty

  6. Ventilation controls.

    violationRecord 9938393

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  7. Handling of materials

    accidentRecord 220260610028

    Days away from work only

    Accident narrative

    Employee was taking out belt structure. They pulled on a piece of structure that was laying between the top and bottom belt and felt pain in their back (strain).

  8. Roof control plan.

    violationRecord 9938579

    30 CFR 75.220(a)(1) · $245.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F026D13

    103(i) · 17.0 on-site hours reported

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9938578

    30 CFR 75.1731(a) · $193.00 proposed penalty

  11. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5156436

    30 CFR 75.1911(a)(3) · $151.00 proposed penalty

  12. Other safeguards.

    violationRecord 9938577

    30 CFR 75.1403 · $313.00 proposed penalty

  13. Frequency of examinations.

    violationRecord 5156435

    30 CFR 75.512-2 · $193.00 proposed penalty

  14. Permanent splicing of trailing cables.

    violationRecord 5156434

    30 CFR 75.604(b) · $193.00 proposed penalty

  15. Ventilation controls.

    violationRecord 9938392

    30 CFR 75.333(c)(4) · Significant and substantial (S&S) · $432.00 proposed penalty

  16. Preshift examination at fixed intervals.

    violationRecord 9938391

    30 CFR 75.360(f) · $226.00 proposed penalty

  17. Preshift examination at fixed intervals.

    violationRecord 9938390

    30 CFR 75.360(b)(11)(iii) · $642.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 9938389

    30 CFR 75.400 · $1,219.00 proposed penalty

  19. Electrical Technical Investigation

    inspectionRecord F00A399

    6.0 on-site hours reported

  20. Examinations.

    violationRecord 9934022

    30 CFR 75.1433(d) · $193.00 proposed penalty

  21. Preshift examination at fixed intervals.

    violationRecord 9938388

    30 CFR 75.360(b)(11)(iii) · $642.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 9938387

    30 CFR 75.400 · $1,219.00 proposed penalty

  23. Preshift examination at fixed intervals.

    violationRecord 9938386

    30 CFR 75.360(f) · $226.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9938385

    30 CFR 75.400 · $366.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F026D12

    103(i) · 8.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.