Laurel Fork Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Roof control plan.
30 CFR 75.220(a)(1) · $1,219.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $313.00 proposed penalty
Spot Inspections
103(i) · 9.5 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $366.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $1,431.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $883.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $3,184.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(d) · $245.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(c) · $165.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $1,679.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $2,312.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Other safeguards.
30 CFR 75.1403
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Sanitary toilet facilities; maintenance.
30 CFR 71.501 · $1,037.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $818.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.