← King II

King II safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9734857

    30 CFR 75.1731(a) · $245.00 proposed penalty

  2. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9734856

    30 CFR 75.1731(b) · $151.00 proposed penalty

  3. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 9734855

    30 CFR 75.1600-2(e) · $151.00 proposed penalty

  4. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9734854

    30 CFR 75.1731(a) · $151.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 9734853

    30 CFR 75.400 · $288.00 proposed penalty

  6. Illumination in working places.

    violationRecord 9734871

    30 CFR 75.1719-1(e)(5)(ii) · $151.00 proposed penalty

  7. Maintenance of incombustible content of rock dust.

    violationRecord 9734852

    30 CFR 75.403 · $151.00 proposed penalty

  8. On-shift examination.

    violationRecord 9734851

    30 CFR 75.362(d)(1)(iii) · $151.00 proposed penalty

  9. Protection of trailing cables.

    violationRecord 9734850

    30 CFR 75.606 · $151.00 proposed penalty

  10. Permanent splicing of trailing cables.

    violationRecord 9734870

    30 CFR 75.604(b) · $151.00 proposed penalty

  11. Ventilation controls.

    violationRecord 9734849

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 9734848

    30 CFR 75.1722(a) · $226.00 proposed penalty

  13. Roof control plan.

    violationRecord 9734847

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9734846

    30 CFR 75.1731(b) · $151.00 proposed penalty

  15. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9734845

    30 CFR 75.1731(a) · $267.00 proposed penalty

  16. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 9734844

    30 CFR 75.1714-3(d) · $151.00 proposed penalty

  17. Protection of trailing cables.

    violationRecord 9734843

    30 CFR 75.606 · $151.00 proposed penalty

  18. Ventilation controls.

    violationRecord 9734842

    30 CFR 75.333(h) · $151.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9734841

    30 CFR 75.400 · $288.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 9734840

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F00807C

    319.8 on-site hours reported

  22. Compliance Follow-up Inspection

    inspectionRecord F00DC2D

    0.5 on-site hours reported

  23. Electric equipment; examination, testing, and maintenance.

    violationRecord 9734864

    30 CFR 77.502 · $151.00 proposed penalty

  24. Permanent splicing of trailing cables.

    violationRecord 9734743

    30 CFR 75.604(b) · $151.00 proposed penalty

  25. Permanent splicing of trailing cables.

    violationRecord 9734742

    30 CFR 75.604(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.