Jerry Fork Eagle safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $245.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(3) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Permissible exposure level.
30 CFR 62.130(a) · $226.00 proposed penalty
Criteria—MSHA Form 7000-1, Section D.
30 CFR 50.20-7(b) · $151.00 proposed penalty
Criteria—MSHA Form 7000-1, Section D.
30 CFR 50.20-7(c) · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $432.00 proposed penalty
Spot Inspections
103(i) · 7.3 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $209.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $313.00 proposed penalty
Spot Inspections
103(i) · 8.3 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $267.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $226.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.