← Jerry Fork Eagle

Jerry Fork Eagle safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5024387

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  2. Violation — cited standard not reported

    violationRecord 5024386

    $7,267.00 proposed penalty

  3. Violation — cited standard not reported

    violationRecord 5024385

    $839.00 proposed penalty

  4. Violation — cited standard not reported

    violationRecord 5024384

    $2,782.00 proposed penalty

  5. Violation — cited standard not reported

    violationRecord 5024383

    $1,467.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 9846950

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9846949

    30 CFR 75.400 · $165.00 proposed penalty

  8. Other safeguards.

    violationRecord 9846948

    30 CFR 75.1403 · $151.00 proposed penalty

  9. Spot Inspections

    inspectionRecord 6321730

    103(i) · 6.0 on-site hours reported

  10. Other safeguards.

    violationRecord 5024382

    30 CFR 75.1403 · $288.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5024381

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5024380

    30 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F007E0C

    103(i) · 9.5 on-site hours reported

  14. Air quality detectors and measurement devices.

    violationRecord 5020491

    30 CFR 75.320(b) · $151.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5020490

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  16. Permissible electric face equipment; maintenance.

    violationRecord 9844176

    30 CFR 75.503 · $313.00 proposed penalty

  17. Machinery and equipment; operation and maintenance.

    violationRecord 9844175

    30 CFR 75.1725(a) · $755.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5020489

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5020488

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F00B814

    103(i) · 12.0 on-site hours reported

  21. Permanent splicing of trailing cables.

    violationRecord 5020487

    30 CFR 75.604(b) · $313.00 proposed penalty

  22. Proximity detection systems.

    violationRecord 5020486

    30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $642.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5020485

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 5020484

    30 CFR 75.380(d)(7)(i) · $313.00 proposed penalty

  25. Roof control plan.

    violationRecord 9849999

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.