← Itmann No 5

Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5131585

    30 CFR 75.512 · $226.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F01AAB0

    103(i) · 7.3 on-site hours reported

  3. Protection from falls of roof, face and ribs.

    violationRecord 5131583

    30 CFR 75.202(a) · $336.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5131582

    30 CFR 75.400 · $504.00 proposed penalty

  5. Ventilation controls.

    violationRecord 5131581

    30 CFR 75.333(h) · $267.00 proposed penalty

  6. Roof control plan.

    violationRecord 5099317

    30 CFR 75.220(a)(1) · $504.00 proposed penalty

  7. Identification of circuit breakers and disconnecting switches.

    violationRecord 5099316

    30 CFR 75.809 · $336.00 proposed penalty

  8. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5099315

    30 CFR 75.601-1 · $151.00 proposed penalty

  9. Criteria—Belt conveyors.

    violationRecord 5091690

    30 CFR 75.1403-5(j) · $151.00 proposed penalty

  10. Ventilation controls.

    violationRecord 5091689

    30 CFR 75.333(h) · $288.00 proposed penalty

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F0081BF

    5.0 on-site hours reported

  12. Power wires and cables; insulation and protection.

    violationRecord 5099314

    30 CFR 75.517 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  13. Roof control plan.

    violationRecord 5099313

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  14. Spot Inspections

    inspectionRecord F020A5F

    103(i) · 8.8 on-site hours reported

  15. Protection from falls of roof, face and ribs.

    violationRecord 5099305

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9833974

    30 CFR 75.400 · $504.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F020A5C

    103(i) · 6.0 on-site hours reported

  18. Methane monitors.

    violationRecord 5099303

    30 CFR 75.342(a)(4) · $336.00 proposed penalty

  19. Methane monitors.

    violationRecord 5099302

    30 CFR 75.342(a)(4) · $336.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5099301

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  21. Mine map.

    violationRecord 5099300

    30 CFR 75.1200 · $151.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 9833973

    30 CFR 75.604(b) · Significant and substantial (S&S) · $504.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9833972

    30 CFR 75.202(a) · $151.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5131579

    30 CFR 75.400 · $504.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F03218C

    103(i) · 7.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.