← Itmann No 5

Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mining methods.

    violationRecord 5180223

    30 CFR 75.203(b) · $267.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5180222

    30 CFR 75.370(a)(1) · $1,968.00 proposed penalty

  3. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5180221

    30 CFR 75.1731(a) · $151.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5180220

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5180219

    30 CFR 75.517 · $504.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5180218

    30 CFR 75.400 · $288.00 proposed penalty

  7. Verbal Hazard Complaint Inspections

    inspectionRecord F010B5A

    12.8 on-site hours reported

  8. Machinery and equipment; operation and maintenance.

    violationRecord 5133908

    30 CFR 75.1725(a) · $177.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5133907

    30 CFR 75.400 · $288.00 proposed penalty

  10. Methane monitors.

    violationRecord 5133906

    30 CFR 75.342(a)(4) · $592.00 proposed penalty

  11. Methane monitors.

    violationRecord 5025490

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  12. Spot Inspections

    inspectionRecord F020DBC

    103(i) · 8.0 on-site hours reported

  13. Mine ventilation plan; submission and approval.

    violationRecord 5133904

    30 CFR 75.370(a)(1) · $883.00 proposed penalty

  14. Mechanical equipment guards.

    violationRecord 5133903

    30 CFR 75.1722(a) · $883.00 proposed penalty

  15. Water sprinkler systems; arrangement of sprinklers.

    violationRecord 5133902

    30 CFR 75.1101-8(b) · $267.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5133901

    30 CFR 75.400 · $592.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5021683

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5021682

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  19. Electric equipment; examination, testing and maintenance.

    violationRecord 5021681

    30 CFR 75.512 · $1,550.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5021680

    30 CFR 75.370(a)(1) · $3,448.00 proposed penalty

  21. Permanent splicing of trailing cables.

    violationRecord 5028602

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  22. Handling of materials

    accidentRecord 220262150024

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE was operating the left side roof bolter in the #1 entry on MMU 003-0. While, bending roof bolt a piece, of rust flaked off the roof bolt entering the right eye of EE. EE received numbing drops and their eyes was washed out in addition to prescription eye drops.

  23. Power wires and cables; insulation and protection.

    violationRecord 5028600

    30 CFR 75.517 · $504.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5028599

    30 CFR 75.512 · $313.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F020DBA

    103(i) · 8.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.