Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F01AA96

    103(i) · 7.5 on-site hours reported

  2. Communications facilities; refuge alternatives.

    violationRecord 5091639

    30 CFR 75.1600-3(a)(1) · $151.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5091638

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  4. Mine ventilation plan; submission and approval.

    violationRecord 5091637

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  5. Ventilation controls.

    violationRecord 5091636

    30 CFR 75.333(e)(1)(ii) · $151.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F01AA95

    103(i) · 5.5 on-site hours reported

  7. Spot Inspections

    inspectionRecord F017F2D

    103(i) · 4.0 on-site hours reported

  8. Mine ventilation plan; submission and approval.

    violationRecord 5095419

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  9. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F0107E2

    12.0 on-site hours reported

  10. Preshift examination at fixed intervals.

    violationRecord 5096887

    30 CFR 75.360(g) · $151.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5096885

    30 CFR 75.400 · $366.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5096884

    30 CFR 75.400 · $366.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5090873

    30 CFR 75.400 · $165.00 proposed penalty

  14. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 5090872

    30 CFR 50.20(a) · $165.00 proposed penalty

  15. Ventilation controls.

    violationRecord 5096886

    30 CFR 75.333(c)(1) · $151.00 proposed penalty

  16. Condition and examination of firefighting equipment.

    violationRecord 5096883

    30 CFR 75.1100-3 · $151.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5096882

    30 CFR 75.1731(a) · $177.00 proposed penalty

  18. Rock dusting.

    violationRecord 5090874

    30 CFR 75.402 · $151.00 proposed penalty

  19. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F008560

    17.8 on-site hours reported

  20. Roof control plan.

    violationRecord 5098237

    30 CFR 75.220(a)(1) · $883.00 proposed penalty

  21. Methane monitors.

    violationRecord 5090751

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  22. Methane monitors.

    violationRecord 5090750

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  23. Preshift examination at fixed intervals.

    violationRecord 5092829

    30 CFR 75.360(g) · $151.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F017F2C

    103(i) · 4.5 on-site hours reported

  25. Criteria—Belt conveyors.

    violationRecord 5091141

    30 CFR 75.1403-5(g)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.