← Itmann No 5

Itmann No 5 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5131577

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  2. Spot Inspections

    inspectionRecord F03218B

    103(i) · 7.5 on-site hours reported

  3. Accumulation of combustible materials.

    violationRecord 5131576

    30 CFR 75.400 · $226.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5131575

    30 CFR 75.604(b) · $1,679.00 proposed penalty

  5. Roof control plan.

    violationRecord 5131574

    30 CFR 75.220(a)(1) · $1,679.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F03218A

    124.5 on-site hours reported

  7. Accumulation of combustible materials.

    violationRecord 5131573

    30 CFR 75.400 · $226.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5131572

    30 CFR 75.1731(a) · $151.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5131571

    30 CFR 75.400 · $226.00 proposed penalty

  10. Spot Inspections

    inspectionRecord F01AAAC

    103(i) · 2.5 on-site hours reported

  11. Verbal Hazard Complaint Inspections

    inspectionRecord F01AAAB

    2.5 on-site hours reported

  12. Machinery

    accidentRecord 220253650002

    Days restricted activity only

    Accident narrative

    EE was operating the roof bolter on the #3 section in the #3 entry just inby spad,3032. EE was placing EE's bolt into the drill pot. EE inadvertently bumped into the rotation lever causing ligament damage to the middle finger and ring finger resulting in sutures on both sides of the damaged fingers.

  13. Spot Inspection

    inspectionRecord F020A53

    3.3 on-site hours reported

  14. Spot Inspections

    inspectionRecord F01AAA9

    103(i) · 5.3 on-site hours reported

  15. Ventilation controls.

    violationRecord 5091682

    30 CFR 75.333(d)(3) · $151.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F01AAA7

    103(i) · 5.5 on-site hours reported

  17. Ventilation Technical Investigation

    inspectionRecord F01AAA5

    4.0 on-site hours reported

  18. Spot Inspections

    inspectionRecord F01AAA4

    103(i) · 4.8 on-site hours reported

  19. Spot Inspections

    inspectionRecord F017F45

    103(i) · 4.0 on-site hours reported

  20. Installation of electric equipment and conductors; permissibility.

    violationRecord 5091174

    30 CFR 75.1002(a) · $151.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5091173

    30 CFR 75.370(a)(1) · $209.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F017F42

    103(i) · 3.0 on-site hours reported

  23. Spot Inspections

    inspectionRecord F00856B

    103(i) · 5.3 on-site hours reported

  24. Spot Inspections

    inspectionRecord F017F3D

    103(i) · 6.0 on-site hours reported

  25. Mine ventilation plan; submission and approval.

    violationRecord 5091168

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.