MINE DETAILS
HARVEY MINE
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Mine coordinates
- HARVEY MINE39.96944, -80.42083Open map ↗
Quarterly trends
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. MSHA quarterly production and employment reports.
Coal production
8,307,083reported short tons
Hours worked
1,107,372reported employee hours
Tons per hour
7.50production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 1,239,740 | 186,070 | 6.66 | 324 | 1/1 mines reporting |
| 2025 Q2 | 1,637,119 | 184,158 | 8.89 | 326 | 1/1 mines reporting |
| 2025 Q3 | 1,441,309 | 181,512 | 7.94 | 324 | 1/1 mines reporting |
| 2025 Q4 | 1,245,774 | 176,166 | 7.07 | 327 | 1/1 mines reporting |
| 2026 Q1 | 1,360,132 | 188,829 | 7.20 | 327 | 1/1 mines reporting |
| 2026 Q2 | 1,383,009 | 190,637 | 7.25 | 328 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
Safety and enforcement
2025-01-01 – 2026-10-18
Violations
28517 significant & substantial (S&S)
Accident records
270 records classified as fatality
Proposed penalties · USD
55,744.00258 of 285 violations with amounts
On-site inspection hours
5,320.00186 inspections · 186 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 33 | 0 | 9,264.00 | 4 | 0 | 20 | 813.5 |
| 2025-Q2 | 40 | 2 | 6,648.00 | 4 | 0 | 23 | 862.5 |
| 2025-Q3 | 56 | 1 | 9,969.00 | 1 | 0 | 19 | 730.0 |
| 2025-Q4 | 18 | 2 | 4,607.00 | 8 | 0 | 20 | 557.5 |
| 2026-Q1 | 36 | 4 | 9,873.00 | 3 | 0 | 27 | 841.5 |
| 2026-Q2 | 46 | 3 | 9,693.00 | 2 | 0 | 32 | 716.0 |
| 2026-Q3 | 45 | 3 | 5,690.00 | 5 | 0 | 38 | 712.0 |
| 2026-Q4 * | 11 | 2 | — | 0 | 0 | 7 | 87.0 |
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
Safety activity
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was helping to hang high voltage cable along 9 South Track, when a small rock came off the rib and hit the left side of nose. Employee was diagnosed with a nasal fracture.
FALL OF ROOF OR BACK · ACCIDENT ONLY
Accident narrative
An unintentional roof fall occurred in 3 North 1 Mains #1 Entry 6-7 Wall. There were no injuries as a result of this incident. Conditions contributing to the roof fall are adverse roof conditions and a shift of the strata causing the roof strata to separate above the anchorage.
ENTRAPMENT · ACCIDENT ONLY
Accident narrative
The BMX Portal Elevator hoist was out of service due to a door switch fault at 10:50am. No persons were injured and 2 employees were entrapped due to this event. The Hoist elevator began operation again at 11:18am and the employees exited the elevator.
STRIKING OR BUMPING · DAYS AWAY FROM WORK ONLY
Accident narrative
IE was positioning themselves in the driver seat of a mantrip and their knee was driven into the operators box as they sat down. Injury was not the result of a training or compliance issue.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Accident narrative
EE was standing on guarding rail 3 ft in air when rail broke; they extended left hand to break fall & crashed into the nearby wall w/that hand. EE ended up w/ scratch on L forearm, pain in L shoulder/R lower back. Worked rest of shift. Stiff/sore next day so went to Dr, was put on restrictions we can't accommodate, so lost time eff. 7/4.
IGNITION OR EXPLOSION OF GAS OR DUST · ACCIDENT ONLY
Accident narrative
An ignition occurred in the 3N miner section, while mining through a sandstone intrusion.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Accident narrative
IE was a passenger in a mantrip headed outby on the inby side of the mantrip, headed toward the elevator bottom. The mantrip entered a switch that had been left for the turn by an unknown individual. IE was thrown from the mantrip and suffered injury to EE's right knee. Injury was not the result of a training or compliance issue.
IGNITION OR EXPLOSION OF GAS OR DUST · ACCIDENT ONLY
Accident narrative
An ignition occurred in 9 South Left mains miner section while mining through an abnormal rock intrusion.
IGNITION OR EXPLOSION OF GAS OR DUST · ACCIDENT ONLY
Accident narrative
An ignition occurred in 9 South Left mains miner section. They had mined through an abnormal rock intrusion. During a non-coal cutting period, the conveyor chain was started and caused an ignition at the miner.
HOISTING · ACCIDENT ONLY
Accident narrative
The 1A Capsule at the 1A shaft was out of service due to a malfunction with Up Overtravel electrical switch.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
While prying a rock off the miner, the drill steel shifted up when the rock came off the miner. They let go of the steel and it came down and hit the top of their hard hat, which pushed down on their safety glasses causing a scrape on their nose and a chipped front tooth.
HOISTING · DYS AWY FRM WRK & RESTRCTD ACT
Accident narrative
Employees right knee was caught between the bucket being raised and the bucket on the bottom of the shaft.
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was cutting a plank for blocking rail when the bucksaw became stuck in a knot. Employee cut their hand after pulling the saw loose. Injury was not the result of a training or compliance issue.
EXPLODING VESSELS UNDER PRESSURE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was observing the removal of a joint of 3" waterline. When the staple was removed, the hose blew out under pressure. The hose struck the employee in the mouth and head.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was observing the removal of a joint of 3" hose. When the staple was removed from one end of the hose, the hose blew out under pressure. The stream of water forced the employee to the ground, where EE injured EE's arm and hip.
EXPLODING VESSELS UNDER PRESSURE · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was observing the removal of a joint of 3" waterline. When the staple was removed from one end of the hose, the hose blew out under pressure. The hose struck the employee on the wrist.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was changing a cradle at 3 East 58 Wall, 4 Mother Belt on the tight side, while the employee was maneuvering the cradle it slipped pinching the right ring finger between the cradle and the bedrail. The event resulted in a Fracture to right ring finger and a laceration requiring sutures.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was removing old belt structure from an area and stacking it on scoop. A piece slipped out and accidentally struck employee on the hand that was placed against the scoop bucket.
HOISTING · ACCIDENT ONLY
Accident narrative
The elevator at Patterson Creek portal was stopped because of a dip in power. Power dipped briefly and no fan service was lost at the time. The elevator needed the rope gripper release / safety switch reset and then the elevator returned to normal operation.
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was walking by miner after placing crib under the cat. Inby last rib strap, the rib rolled out and broke into pieces, striking them on the right side of the face. This caused a laceration to right ear/head and contusion to face/jaw. Employee received sutures and fractures to the jaw/head. There were rock rib conditions and miner cutting below btm levels unevenly.
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was attempting to set a jack in the roof to secure a tailpiece during a belt move. The jack needed lowered for adjustment. When they set the jack down, the employee's hand was caught between the jack and the tailpiece. Injury was not the result of a training or compliance issue.
HOISTING · ACCIDENT ONLY
Accident narrative
The elevator at Patterson Creek portal was out of service due to the a set of the rope gripper pads becoming damaged. The pads where replaced. The VFD also faulted during this time period, requiring it to be replaced and reprogrammed. Once work completed the elevator returned to normal service.
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was building a stopping, and was tackled to the ground by an employee of a different contracting company, resulting in a shoulder injury. EE continued to work unrestricted until 4/5/2025. Injury was not the result of a training or compliance issue.
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was swinging a sledgehammer to break up a rock on top of the miner in the 9 South Mains- Right section, while swinging the hammer EE's left ring finger was caught between the hammer handle and the miner frame. This event resulted in a cut requiring 16 sutures and a fracture to the tip of finger.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
Employee was throwing block into the scoop bucket. As EE was throwing a block, EE did not lift the block high enough. EE accidentally hit hand against the scoop bucket because EE's hand was wrapped around the block while in movement causing injury to finger.
Safety sources and definitions
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Coal shipments and quality
Receipts reported by power plants and terminals, matched by MSHA mine ID.
No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Coverage, sources and calculations
- Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
- Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
- Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
- Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
- USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
- Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
- 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
- 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs
EIA ANNUAL COAL REPORT · 2024
Coal prices and estimated revenue
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Harvey Mine3610045 · Greene, Pennsylvania | 5,743,707 | — | — | — | County sales or price not published3 eligible mines / 3 sales respondents |
Method, assumptions and source records
- This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
- Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
- The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
- FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
- Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
- County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
- Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
OWNERSHIP
Operator and controller history
Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.
Core Natural Resources InccontrolsConsol Pennsylvania Coal Company LLCoperatesHARVEY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 3610045CONSOL Energy InccontrolsConsol Pennsylvania Coal Company LLCoperatesHARVEY MINE
msha-controller-operator-history · controller/operator co-tenure derived on mine 3610045Other historical summaries · source-specific periods
RECORD SUMMARY
Production, safety and enforcement
These summaries use the periods stated on each card, independently of the reporting period above.
Accidents and injuries
260 historical accident/injury rows; 0 coded fatalities and 9,599 lost days across the published record.
accidentsmine-production-quarterlyViolations and penalties
1,846 violation rows across the full record; 128 carry an S&S flag and $434,927 appears in current assessed amounts.
inspectionsviolationsassessed-violationsorders-107aOccupational health samples
12,263 coal dust; 465 coal quartz; 381 noise. 0 personal-sample rows have a published C/E ratio above 1; 64 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
coal-dust-samplesquartz-samplesnoise-samplesQuarterly production and employment
191K employee hours and 328 summed average employees across reported subunits in the latest published quarter.
mine-production-quarterlymine-production-yearlyContests, conferences and decisions
290 contested-violation rows, 298 civil-penalty docket/decision rows, and 63 conference records linked by issuance number.
conferencescontested-violationscivil-penalty-dockets-decisionsContractors
Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
contractor-production-quarterlycontractor-production-yearlyaccidentsviolationsInspections
1,179 inspection events and 56K published inspection hours across the historical record.
inspectionsviolationsHEALTH SAMPLING
Silica and quartz
Coal quartz, metal/nonmetal personal samples and area samples. Snapshot Oct 18, 2026. 465 silica records across the mine’s published history.
Coal quartz concentration
Quarterly mean · µg/m³ · not-voided samples
— No eligible measurements. * Quarter in progress. Means describe the available samples, not average exposure across the mine.
Quartz % is the sample’s quartz content; µg/m³ is its reported concentration. Personal C/E is the ratio to the limit published with that sample. Personal and area concentration units and void status are not specified in those source files.
| Date / sample | Dataset / analyte | Occupation / area | Measurement | Sample status | Published action |
|---|---|---|---|---|---|
| 58599931 / lab 2026042001 | Coal quartzQuartz | JACK SETTER (LONGWALL)NON DESIGNATED OCCUPATION | 24 µg/m³3.3% quartz | Not voided | Not reported |
| 58600095 / lab 2026042006 | Coal quartzQuartz | MECHANICNON DESIGNATED OCCUPATION | 3 µg/m³1.7% quartz | Not voided | Not reported |
| 58599964 / lab 2026042003 | Coal quartzQuartz | LONGWALL OPERATOR (TAILGATE SIDE)DESIGNATED OCCUPATION | 29 µg/m³2.9% quartz | Not voided | Not reported |
| 58599594 / lab 2026042002 | Coal quartzQuartz | HEADGATE OPERATORNON DESIGNATED OCCUPATION | 9 µg/m³2.9% quartz | VoidedMMU NOT IN PRODUCING STATUS | Not reported |
| 58599981 / lab 2026041066 | Coal quartzQuartz | OCCUPATION CODE NOT FOUNDDESIGNATED AREA | 0 µg/m³—% quartz | Not voided | Not reported |
| 58599846 / lab 2026041063 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 7 µg/m³3.4% quartz | Not voided | Not reported |
| 58599621 / lab 2026041064 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 14 µg/m³3.4% quartz | Not voided | Not reported |
| 58599649 / lab 2026039763 | Coal quartzQuartz | JACK SETTER (LONGWALL)NON DESIGNATED OCCUPATION | 11 µg/m³1.9% quartz | Not voided | Not reported |
| 58600030 / lab 2026039766 | Coal quartzQuartz | HEADGATE OPERATORNON DESIGNATED OCCUPATION | 4 µg/m³1.6% quartz | VoidedMMU NOT IN PRODUCING STATUS | Not reported |
| 58599856 / lab 2026039764 | Coal quartzQuartz | MECHANICNON DESIGNATED OCCUPATION | 3 µg/m³1.8% quartz | Not voided | Not reported |
| 58599941 / lab 2026039760 | Coal quartzQuartz | LONGWALL OPERATOR (HEADGATE SIDE)NON DESIGNATED OCCUPATION | 13 µg/m³1.2% quartz | VoidedMMU NOT IN PRODUCING STATUS | Not reported |
| 58599946 / lab 2026039761 | Coal quartzQuartz | LONGWALL OPERATOR (TAILGATE SIDE)DESIGNATED OCCUPATION | 6 µg/m³0.9% quartz | Not voided | Not reported |
| 58597393 / lab 2026038555 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 4 µg/m³2.9% quartz | Not voided | Not reported |
| 58597265 / lab 2026038556 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 15 µg/m³3.7% quartz | Not voided | Not reported |
| 58597258 / lab 2026034203 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 2 µg/m³1.4% quartz | Not voided | Not reported |
| 58597452 / lab 2026034199 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 8 µg/m³3.1% quartz | Not voided | Not reported |
| 58600048 / lab 2026029701 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (INTAKE SIDE)NON DESIGNATED OCCUPATION | 1 µg/m³0.7% quartz | Not voided | Not reported |
| 58598176 / lab 2026022938 | Coal quartzQuartz | CONTINUOUS MINER OPERATORDESIGNATED OCCUPATION | 21 µg/m³4% quartz | Not voided | Not reported |
| 58598184 / lab 2026022936 | Coal quartzQuartz | ROOF BOLTER (MOUNTED) (RETURN SIDE)NON DESIGNATED OCCUPATION | 17 µg/m³3.7% quartz | Not voided | Not reported |
| 58598383 / lab 2026021026 | Coal quartzQuartz | LONGWALL OPERATOR (HEADGATE SIDE)NON DESIGNATED OCCUPATION | 14 µg/m³1.4% quartz | VoidedMMU NOT IN PRODUCING STATUS | Not reported |
Sources and interpretation
- Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
- Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
- Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
- Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
- Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.
Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗
EIA + TITLE 30
EIA production and cited regulations
EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.
- LABOR HOURS
- 693,086
- AVG EMPLOYEES
- 326
- SUPPLY REGION
- Appalachia Northern
- UNION
- No union code published
- OPERATION
- Mine only
- COMPANY TYPE
- Operating Subsidiary
1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.
RECENT PUBLIC RECORDS
Recent violations and samples
Latest records retained for inspection; aggregates above use the full source history.
Coal dust, noise and other contaminants. Silica records above ↑
SOURCE COVERAGE
Reporting dates and coverage
17 datasets contain linked records. Missing datasets are listed below.
NOTES
Limitations
- Contractor production is entity-level and is never represented as mine-attributable.
- Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.