Francisco Underground Pit safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $504.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $245.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Roof Control Technical Investigation
44.0 on-site hours reported
Spot Inspections
103(i) · 8.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $549.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $288.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $313.00 proposed penalty
Spot Inspections
103(i) · 6.3 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $226.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(1) · $883.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.3 on-site hours reported
Spot Inspections
103(i) · 7.5 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $366.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.