← Flying Eagle

Flying Eagle safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5091045

    30 CFR 75.370(a)(1) · $3,736.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5091044

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5091043

    30 CFR 75.400 · $697.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5091042

    30 CFR 75.400 · $697.00 proposed penalty

  5. Power centers.

    violationRecord 5091021

    30 CFR 75.825(c) · $151.00 proposed penalty

  6. Permanent splicing of trailing cables.

    violationRecord 5091020

    30 CFR 75.604(b) · $151.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5091019

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5091018

    30 CFR 75.400 · $226.00 proposed penalty

  9. Roof control plan.

    violationRecord 5091017

    30 CFR 75.220(a)(1) · $504.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F02B614

    155.3 on-site hours reported

  11. Roof control plan.

    violationRecord 5091016

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5091015

    30 CFR 75.370(a)(1) · $1,550.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 5091014

    30 CFR 75.1722(a) · $165.00 proposed penalty

  14. Spot Inspection

    inspectionRecord F020A3B

    6.0 on-site hours reported

  15. Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.

    violationRecord 9839730

    30 CFR 50.20(a) · $151.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 9839729

    30 CFR 75.202(a) · Significant and substantial (S&S) · $5,574.00 proposed penalty

  17. Spot Inspection

    inspectionRecord F009F41

    6.0 on-site hours reported

  18. Electrical Technical Investigation

    inspectionRecord F00EB16

    6.5 on-site hours reported

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9844809

    30 CFR 75.380(d)(4) · $366.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 9837742

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  21. Spot Inspection

    inspectionRecord F009F3F

    14.8 on-site hours reported

  22. Weekly examination.

    violationRecord 9837741

    30 CFR 75.364(g) · $151.00 proposed penalty

  23. Spot Inspection

    inspectionRecord F026021

    2.0 on-site hours reported

  24. Maintenance of incombustible content of rock dust.

    violationRecord 5090111

    30 CFR 75.403 · $151.00 proposed penalty

  25. Maintenance of incombustible content of rock dust.

    violationRecord 5090110

    30 CFR 75.403 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.