Accumulation of combustible materials.
30 CFR 75.400 · $883.00 proposed penalty
Violation — cited standard not reported
$168.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $549.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $245.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(b) · $288.00 proposed penalty
Violation — cited standard not reported
$320.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $4,047.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $288.00 proposed penalty
Mine ventilation plan; contents.
30 CFR 75.371(l) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Identification of circuit breakers and disconnecting switches.
30 CFR 75.809 · $151.00 proposed penalty
Regular Safety and Health Inspection
123.3 on-site hours reported
Health Technical Investigation
7.8 on-site hours reported
Diesel equipment inventory.
30 CFR 72.520(b) · $151.00 proposed penalty
Diesel equipment inventory.
30 CFR 72.520(b) · $151.00 proposed penalty
Spot Inspection
4.0 on-site hours reported
Mobile equipment; automatic warning devices.
30 CFR 77.410(a)(1) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(a) · $2,312.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 77.1109(e)(1) · $313.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $398.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.