  1. Loading and haulage equipment; installations.

    violationRecord 5097921

    30 CFR 77.1605(b) · $336.00 proposed penalty

  2. Installation of main mine fans.

    violationRecord 5097920

    30 CFR 75.310(a)(3) · $1,126.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5097918

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5097917

    30 CFR 75.604(b) · $959.00 proposed penalty

  5. Permanent splicing of trailing cables.

    violationRecord 5097916

    30 CFR 75.604(b) · $959.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5097915

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5097914

    30 CFR 75.512 · $755.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5091166

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  9. Weekly examination.

    violationRecord 5091165

    30 CFR 75.364(h) · $151.00 proposed penalty

  10. Non-Injury Accident Investigation

    inspectionRecord F00CDC6

    14.3 on-site hours reported

  11. Protection from falls of roof, face and ribs.

    violationRecord 9838397

    30 CFR 75.202(a) · Significant and substantial (S&S) · $15,768.00 proposed penalty

  12. Violation — cited standard not reported

    violationRecord 9838396
  13. Other safeguards.

    violationRecord 5097911

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,968.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5091163

    30 CFR 75.333(h) · $398.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5097910

    30 CFR 75.202(a) · $17,082.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5097909

    30 CFR 75.400 · $1,219.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5097908

    30 CFR 75.604(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5097907

    30 CFR 75.202(a) · $1,037.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5097906

    30 CFR 75.400 · $7,676.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5097905

    30 CFR 75.400 · $697.00 proposed penalty

  21. On-shift examination.

    violationRecord 5097904

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  22. Installation of high-voltage transmission cables.

    violationRecord 5097903

    30 CFR 77.807 · $1,679.00 proposed penalty

  23. Roof control plan.

    violationRecord 5097902

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F00EB33

    7.5 on-site hours reported

  25. Automatic fire warning devices; actions and response.

    violationRecord 9839998

    30 CFR 75.1103-5(a)(1) · $177.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.