Excel #5 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 4.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $313.00 proposed penalty
Clamping of trailing cables to equipment.
30 CFR 75.605 · $209.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Spot Inspections
103(i) · 3.0 on-site hours reported
Quarterly sampling; designated areas.
30 CFR 70.209(a) · $313.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $432.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(2) · $432.00 proposed penalty
Quarterly sampling; mechanized mining units.
30 CFR 70.208(a)(1) · $336.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty
Immediate notification.
30 CFR 50.10(d) · $151.00 proposed penalty
Regular Safety and Health Inspection
551.8 on-site hours reported
Spot Inspection
11.0 on-site hours reported
Spot Inspections
103(i) · 4.5 on-site hours reported
Fall of roof or back
Days away from work only
Accident narrative
Employee was down on 1 knee cleaning EE's dust box on the roof bolter. A piece of rock fell from between the rib and outside bolt. The rock landed on the back of the foot at the heal. This caused a bruise to the foot.
Spot Inspections
103(i) · 5.0 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $165.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $1,219.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $504.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(a) · $313.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $209.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 75.701 · $209.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $209.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.