Excel #5 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Installation of high-voltage transmission cables.
30 CFR 75.807
Permissible electric face equipment; maintenance.
30 CFR 75.503
Spot Inspections
103(i) · 0.0 on-site hours reported
Permissible electric face equipment; maintenance.
30 CFR 75.503
Escapeway maps.
30 CFR 75.1505(b)
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S)
Spot Inspections
103(i) · 2.8 on-site hours reported
Inspection of fire suppression devices.
30 CFR 75.1107-16(b)
Permissible electric face equipment; maintenance.
30 CFR 75.503
Roof control plan.
30 CFR 75.220(a)(1)
Cable fittings; suitability.
30 CFR 75.515
Regular Safety and Health Inspection
82.8 on-site hours reported
Spot Inspections
103(i) · 4.0 on-site hours reported
Spot Inspections
103(i) · 4.0 on-site hours reported
Non-Injury Accident Investigation
11.8 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S)
Violation — cited standard not reported
Fall of roof or back
Accident only
Accident narrative
Mine examiner found a roof fall in the travel way in the return in old works. The fall was in the northwest submains 1 break below spad 771.
Spot Inspections
103(i) · 3.0 on-site hours reported
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Handling of materials
No dys awy frm wrk,no rstr act
Accident narrative
Employee was loading the bolter, as they were throwing pizza pans across the bolter, they caught their forearm on the corner of some plates causing a laceration that required stitches.
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(c)(5) · $151.00 proposed penalty
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(a)(2) · $151.00 proposed penalty
Spot Inspections
103(i) · 2.0 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.