ENLOW FORK MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $193.00 proposed penalty
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $193.00 proposed penalty
Health Technical Investigation
11.3 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · $193.00 proposed penalty
Spot Inspections
103(i) · 2.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Health Technical Investigation
11.3 on-site hours reported
Spot Inspections
103(i) · 6.8 on-site hours reported
Machinery
Days away from work only
Accident narrative
While advancing shields and Pan in G-6 longwall section, a large portion of the roof fell filling up the pan-line. A rock approx 6ft by 2 ft by 6 inches came out of the pan-line and struck the employee on the back of the right leg. The employee suffered a fractured tib/fib as a result.
Spot Inspections
103(i) · 7.3 on-site hours reported
Installation of electric equipment and conductors; permissibility.
30 CFR 75.1002(a) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $398.00 proposed penalty
Health Technical Investigation
11.5 on-site hours reported
Ventilation controls.
30 CFR 75.333(d)(3) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $642.00 proposed penalty
Installation of water sprinkler systems; requirements.
30 CFR 75.1101-7(a) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Spot Inspections
103(i) · 4.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.