Emery Valley Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Regular Safety and Health Inspection
283.0 on-site hours reported
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $209.00 proposed penalty
Nonpowered haulage
Days away from work only
Accident narrative
EE was in the surface shop pulling a rolling tool cart behind EE. The cart caught the heel of EE's left foot, causing the cart to run up the back of EE's heel and put weight and pressure on EE's foot. X-Rays showed a fracture to the big toe's metatarsal bone of EE's left foot.
Ventilation controls.
30 CFR 75.333(h) · $193.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Emergency tethers.
30 CFR 75.1714-6 · $151.00 proposed penalty
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
30 CFR 48.7(a) · $288.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
EE on ladder to foam top of Vent Line Curtain. Ladder moved & EE fell to mine floor. EE landed on feet, but left leg folded under EE upon impact. Doctor referred EE for MRI to diagnose if any damage to ACL. MRI was not available till 2/27/2025 and results not received till 3/6/2025. MRI was normal but was diagnosed with knee sprain and referred for PT.
Mechanical equipment guards.
30 CFR 75.1722(a) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Stationary grinding machines; protective devices.
30 CFR 75.1723(c) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $288.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(f) · $288.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $432.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $465.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Machinery
Dys awy frm wrk & restrctd act
Accident narrative
EE was using a battery hand grinder. The tool slipped and when grabbing, EE hit the trigger. This caused the grinder to flip around. The spinning grinding wheel cut the back of EE's left hand, causing a laceration that required 9 stitches. It also chipped a finger bone & ligament. EE was referred to an Orthopedic Doctor.
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $465.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $193.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $226.00 proposed penalty
Underground sanitary facilities; installation and maintenance.
30 CFR 75.1712-6(b) · $151.00 proposed penalty
Weekly examination.
30 CFR 75.364(g) · $959.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(v) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.