MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Emery Valley Mine

ActiveUndergroundCoal (Bituminous)
MSHA MINE ID4200079
LOCATIONEmery, UT
PUBLIC RECORD17,939 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

259

13 significant & substantial (S&S)

  1. 2025 Q152
  2. 2025 Q261
  3. 2025 Q333
  4. 2025 Q427
  5. 2026 Q112
  6. 2026 Q234
  7. 2026 Q336
  8. 2026 Q4 *4

Accident records

15

0 records classified as fatality

  1. 2025 Q13
  2. 2025 Q23
  3. 2025 Q31
  4. 2025 Q44
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q32
  8. 2026 Q4 *0

Proposed penalties · USD

77,640.00

171 of 259 violations with amounts

  1. 2025 Q145,596
  2. 2025 Q217,507
  3. 2025 Q36,927
  4. 2025 Q47,610
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

2,051.25

15 inspections · 15 with hours

  1. 2025 Q1344.00
  2. 2025 Q2291.50
  3. 2025 Q3316.25
  4. 2025 Q4216.00
  5. 2026 Q1185.25
  6. 2026 Q2333.00
  7. 2026 Q3358.75
  8. 2026 Q4 *6.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q152645,596.00301344.0
2025-Q261017,507.00303291.5
2025-Q33316,927.00102316.3
2025-Q42717,610.00402216.0
2026-Q1123—102185.3
2026-Q2341—101333.0
2026-Q3361—203358.8
2026-Q4 *40—0016.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5037232

    75.1600-2(e)

  2. violation5037231

    75.1100-3

  3. violation5037032

    75.370(a)(1)

  4. violation5037031

    75.1702

  5. inspectionF010BB9

    Regular Safety and Health Inspection · 6.5 on-site hours

  6. violation5030947

    77.1605(b)

  7. violation5030946

    70.210(f)

  8. violation5036352

    77.505

  9. violation5037214

    75.1100-2(f)

  10. violation5037213

    75.370(a)(1)

  11. violation5037212

    75.1600-2(e)

  12. violation5037211

    75.1909(d)

  13. violation5037210

    75.1100-3

  14. violation5036347

    77.513

  15. violation5030945

    75.1101-16(a)

  16. violation5030944

    75.1100-1(a)

  17. violation5037209

    75.400

  18. violation5037208

    75.1101-16(a)

  19. violation5030943

    75.1714-5

  20. inspectionF03302D

    Non-Injury Accident Investigation · 28.8 on-site hours

  21. violation5037206

    Description not reported

  22. violation5030942

    75.202(a)

  23. violation5037207

    75.512

  24. violation5037205

    75.503

  25. violation5030941

    75.1600-2(e)

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS80,6654 rows · 2 receiving plants
HEAT CONTENT · BTU/LB11,994Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.40 / 9.91Separate averages over measured receipts
DELIVERED COST · USD/TON86.31100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *80,14611,9930.409.9286.30
2025-Q451912,1420.429.7087.52
Month / sourceReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2025-10EIA row 28926 · finalHunter6165 · UT · BRONCO UTAH OPERATIONS,LLC51987.5212,1420.429.70ContractBITTruck
2025-09EIA row 25860 · finalHunter6165 · UT · BRONCO UTAH OPERATIONS,LLC42,12787.0212,0700.419.90ContractBITTruck
2025-08EIA row 22731 · finalHunter6165 · UT · BRONCO UTAH OPERATIONS,LLC35,68186.2011,9520.3910.10ContractBITTruck
2025-08EIA row 22833 · finalIntermountain Power Project6481 · UT · CORE NATURAL RESOURCES, INC2,33874.9111,2180.417.40ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Emery Mine4200079 · Emery, Utah1,064,605———County sales or price not published2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYWolverine Fuels LLC → Emery Valley Resources, LLC. → Emery Valley Mine
HISTORY RECORDS719 relationships
INTERVAL CHECK1 REVIEWcontroller/operator overlap
—

Wolverine Fuels LLCcontrolsEmery Valley Resources, LLC.operatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

Core Natural Resources InccontrolsCONSOL Mining Company LLCoperatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

Bronco Coal Resources, LLCcontrolsBronco Utah Operations, LLC.operatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

CONSOL Energy InccontrolsCONSOL Mining Company LLCoperatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

Robert E MurraycontrolsConsolidation Coal CompanyoperatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

CONSOL Energy InccontrolsConsolidation Coal CompanyoperatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
—

Petty Horace AcontrolsBrowning Coal CooperatesEmery Valley Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4200079
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

143 historical accident/injury rows; 0 coded fatalities and 1,984 lost days across the published record.

ACCIDENT + INJURY RECORD73 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

2,916 violation rows across the full record; 510 carry an S&S flag and $1,994,823 appears in current assessed amounts.

ENFORCEMENT ACTIVITY1,568 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

6,156 coal dust; 260 coal quartz; 562 noise. 0 personal-sample rows have a published C/E ratio above 1; 48 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE7K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

75K employee hours and 155 summed average employees across reported subunits in the latest published quarter.

2026-Q2315K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

923 contested-violation rows, 928 civil-penalty docket/decision rows, and 64 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE1,915 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT14 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

393 inspection events and 30K published inspection hours across the historical record.

OVERSIGHT COVERAGE62 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records1212 coal · 0 personal · 0 area
Sample status12 not voided0 voided · 0 status not reported
Mean coal quartz concentration6.58 µg/m³12 eligible measurements · 0 missing concentration
2026 · Mar 5, 2026–Aug 19, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58544618 / lab 2026034415Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION4 µg/m³3.5% quartzNot voidedNot reported
58542288 / lab 2026030681Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION3 µg/m³1.7% quartzNot voidedNot reported
58542285 / lab 2026030679Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION48 µg/m³9.2% quartzNot voidedNot reported
58542445 / lab 2026028604Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION4 µg/m³1.9% quartzNot voidedNot reported
58538306 / lab 2026024291Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION0 µg/m³0.3% quartzNot voidedNot reported
58538416 / lab 2026020499Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION5 µg/m³2.3% quartzNot voidedNot reported
58516990 / lab 2026014787Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION1 µg/m³0.6% quartzNot voidedNot reported
58516784 / lab 2026014347Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION2 µg/m³0.5% quartzNot voidedNot reported
58516740 / lab 2026014345Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION3 µg/m³0.8% quartzNot voidedNot reported
58516728 / lab 2026012271Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION6 µg/m³0.4% quartzNot voidedNot reported
58516781 / lab 2026011251Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION3 µg/m³0.5% quartzNot voidedNot reported
58516703 / lab 2026008609Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION0 µg/m³—% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
503723275.1600-2(e)Citation
503723175.1100-3Citation
503703275.370(a)(1)Citation
503703175.1702Citation
503094777.1605(b)Citation
503094670.210(f)Citation
503635277.505Citation
503721475.1100-2(f)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustCONTINUOUS MINER OPERATOR
.184 mg/m³Voided · PREDATED
Coal dustBULLDOZER OPERATOR
.048 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.274 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.128 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.134 mg/m³Voided
Coal dustCONTINUOUS MINER OPERATOR
.197 mg/m³Voided · INVALID PRODUCTION
Coal dustCONTINUOUS MINER OPERATOR
.186 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.597 mg/m³Voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors143Jan 22, 2001—Jul 25, 2026mine-keyed
Addresses of Recordidentity · logistics1Sep 19, 2017—Sep 19, 2017mine-keyed
Assessed Violationscompliance · legal2,738Jan 23, 2001—Nov 25, 2025mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal928Dec 28, 2004—Sep 30, 2026mine-keyed
Coal Dust Sampleshealth · safety6,156Dec 30, 2002—Nov 29, 2030mine-keyed
Conferencescompliance · legal64Mar 27, 2001—Dec 15, 2023mine-keyed
Contested Violationscompliance · legal923Apr 27, 2007—Nov 6, 2025mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety2,021Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety428Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance7Jan 1, 1950—Feb 17, 2026mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance334Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance64Not published—Not publishedmine-keyed
Inspectionssafety · compliance393Nov 9, 2000—Oct 1, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment562Sep 5, 2002—Aug 19, 2026mine-keyed
Quartz Samples — Coalhealth · safety260Dec 30, 2002—Aug 19, 2026mine-keyed
Violationscompliance · safety · legal2,916Jan 23, 2001—Oct 5, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.